FIELD: oil and gas production industry. SUBSTANCE: this is aimed at increasing efficiency of oil and gas recovery and reducing periods of repair and insulation operations in reservoirs which are made up of water-bearing sandstone. According to method, injected into untight interval of connecting production strings are soluble glass and water solution of calcium chloride. Injection of aforesaid reagents is performed simultaneously or separately. After that, limiting fringe is built up by injecting appropriate product with subsequent final fixing by injecting cement slurry. EFFECT: higher efficiency. 1 cl
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING OF WELL | 2010 |
|
RU2412333C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRINGS | 2009 |
|
RU2416020C1 |
METHOD SETTING PROFILES OF ACCEPTANCE OF INJECTION WELLS | 2000 |
|
RU2169836C1 |
RESTORING METHOD OF SEALING OF CASING STRINGS | 2011 |
|
RU2471963C1 |
METHOD OF TREATMENT OF BOTTOM-HOLE ZONE OF FORMATION LOW-PRODUCTIVE RESERVOIRS | 2001 |
|
RU2182223C1 |
METHOD OF RECOVERY OF CASING SEALING | 2002 |
|
RU2211305C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT PRESENTED BY POROUS-FRACTURED RESERVOIR | 2000 |
|
RU2171368C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF LOW-PRODUCTIVE RESERVOIRS IN BED | 1998 |
|
RU2139425C1 |
METHOD OF SECONDARY CEMENTING OF PROCESS WELL OF UNDERGROUND RESERVOIRS OF VARIOUS PURPOSE | 2012 |
|
RU2485283C1 |
Authors
Dates
1998-07-27—Published
1997-08-28—Filed