FIELD: oil and gas industry.
SUBSTANCE: when implementing the above method, cable, on which electric discharge switches are fixed, is lowered to tubing through the length from head to bottom-hole zone or to the depth of possible formation of asphaltene-resin and paraffin deposits. Voltage pulses or packs of voltage pulses with required parameters are supplied via the cable to each of the discharge switches from the control unit (CU) located on the surface. Discharge is performed on any of the discharge switches irrespective of the other discharge switches or on any group of discharge switches, which is chosen from their total number, and local heating is performed at the discharge point. In order to monitor processes, signals are received from acoustic sensors, temperature sensors and pressure sensors, which are installed inside the tubing and intertube space. Thus, electro-hydrodynamical impact waves are initiated. Cables are connected to CU that consists of electrically interconnected power supply, controller, pulse generators, control unit of generator pulse parameters and other required units, including unit of acoustic sensors and temperature and pressure sensors.
EFFECT: reduction of power consumption; increase in well flow rate.
18 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ELIMINATION AND PREVENTION OF FORMATION OF ASPHALTENE-RESIN-PARAFFIN DEPOSITS IN OIL WELLS AND OIL PIPELINES AND PLANT FOR ITS IMPLEMENTATION | 2011 |
|
RU2475627C1 |
METHOD FOR ION-PLASMA PULSE ACTION ON LOW-WATERED OIL AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2751024C2 |
METHOD OF INTENSIFICATION OF OIL PRODUCTION, LIQUIDATION AND PREVENTION OF DEPOSITS IN OIL AND GAS PRODUCING AND DISCHARGE WELLS AND DEVICE FOR IMPLEMENTATION THEREOF | 2017 |
|
RU2666830C1 |
METHOD OF REAGENT SUPPLY AND WELL TREATMENT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2593850C1 |
METHOD FOR REMOTE CONTROL OF WELL ELECTRIC DISCHARGE DEVICES | 2008 |
|
RU2382373C1 |
AUTONOMOUS HYBRID COMPLEX FOR ASPHALT-RESIN-PARAFFIN DEPOSITS CONTROL IN OIL WELL | 2018 |
|
RU2703040C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
METHOD OF INTENSIFYING OIL PRODUCTION | 1997 |
|
RU2097546C1 |
METHOD OF OPERATING HIGH-VISCOSITY OIL PRODUCING WELLS | 2015 |
|
RU2597304C1 |
WELL BOTTOMHOLE ZONE TREATMENT METHOD | 2015 |
|
RU2601960C1 |
Authors
Dates
2013-01-10—Published
2011-06-01—Filed