FIELD: oil and gas industry.
SUBSTANCE: invention relates to the petroleum industry. Method of operating high-viscosity oil producing well comprises lowering into well an assembly, which consists from bottom-up of a perforated pipe, a packer, a bottom-hole pump, tubing string; actuation bottom-hole pump under action of movements of rod string, extracting high-viscosity oil via tubing string to well head. After beginning of extraction of high-viscosity oil, initial dynamogram is captured and initial maximum and minimum load on rod string is determined. Further, method includes extraction of high-viscosity oil via tubing string by sucker rod pump until rod string hangs. Then in tubing-casing annulus by geophysical elevator, logging cable is lowered with tip at end for pulsed high-frequency thermo-acoustic treatment of well so that tip is located below reception of sucker-rod pump, but 2 m above packer. Pulsed high-frequency thermo-acoustic treatment of well is performed without interruption of high-viscosity oil extraction by sucker-rod pump. During pulsed high-frequency thermo-acoustic treatment of well, periodic capture of dynamogram every 12 hours until restoration of maximum and minimum load on stem to not more than 5 % below initial values is performed. Then, without interruption of extraction of high-viscosity oil, treatment of well is stopped and logging cable with tip is removed from tubing-casing annulus.
EFFECT: improving operational efficiency of producing high-viscosity oil wells, higher quality of cleaning of downhole equipment from asphalt, resin, and paraffin deposits, reduced load on rod string of sucker-rod pump.
1 cl, 1 dwg, 3 ex
Title | Year | Author | Number |
---|---|---|---|
OPERATING METHOD OF HIGH-VISCOSITY OIL RECOVERY DOWNHOLE | 2016 |
|
RU2626484C1 |
METHOD OF REAGENT SUPPLY AND WELL TREATMENT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2593850C1 |
HIGH-VISCOSITY OIL WELL DEVELOPMENT METHOD | 2016 |
|
RU2620692C1 |
WELL OPERATION METHOD | 2015 |
|
RU2599653C1 |
METHOD FOR THERMAL EFFECT ON BOTTOMHOLE FORMATION ZONE WITH HIGH-VISCOSITY OIL AND DEVICE THEREFOR | 2015 |
|
RU2588119C1 |
METHOD FOR THERMAL EFFECT ON BOTTOMHOLE FORMATION ZONE WITH HIGH-VISCOSITY OIL AND DEVICE THEREFOR | 2015 |
|
RU2582363C1 |
INSTALLATION OF BOTTOM-HOLE SCREW PUMP | 2011 |
|
RU2461734C1 |
METHOD FOR PRODUCING HIGH-VISCOSITY OIL WITH IN-WELL THERMAL ACTIVATION OF BINARY SOLUTION | 2023 |
|
RU2812985C1 |
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL | 2005 |
|
RU2293214C2 |
METHOD FOR THERMOCHEMICAL TREATMENT OF OIL CARBONATE FORMATION FOR PRODUCTION OF HIGH-VISCOSITY OIL AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2765941C1 |
Authors
Dates
2016-09-10—Published
2015-07-21—Filed