FIELD: oil and gas industry.
SUBSTANCE: development method of ultraviscous oil deposit involves construction of horizontal production and injection wells, as well as vertical observation wells, pumping of heat carrier through injection wells with heating of productive formation and creation of steam chamber, extraction of products due to steam gravitational drainage through production wells and monitoring of the steam chamber state. Development of ultraviscous oil deposit is performed with control of actual size of steam chamber by changing the volumes of heat carrier pumping and liquid withdrawal; at that, actual volume of steam chamber is determined by gas surveying on the surface in the zone of supposed steam chamber. If the spread area of steam chamber in productive formation is smaller than the distance between vapours of production and injection wells, vapour pumping volume is increased, and if it is larger, then additional vertical production wells are built for the product withdrawal volume; at that, superheated vapour mixed with fuel combustion products is used as heat carrier.
EFFECT: increasing efficiency of ultraviscous oil deposit development due to improvement of determination accuracy of actual size of steam chamber and its spatial position; reduction of financial and material costs at monitoring of steam chamber state.
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL AND NATURAL BITUMEN DEPOSIT | 2019 |
|
RU2728002C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL OR BITUMEN | 2015 |
|
RU2582256C1 |
DEVELOPMENT OF THICK OIL OR BITUMEN DEPOSITS | 2013 |
|
RU2531963C1 |
DEVELOPMENT METHOD OF ULTRAVISCOUS OIL DEPOSIT | 2013 |
|
RU2527984C1 |
METHOD FOR DEVELOPING OF RESERVOIR OF SUPER-VISCOUS OIL OR BITUMEN UNDER THERMAL EXPOSURE | 2018 |
|
RU2673825C1 |
DEVELOPMENT METHOD OF SUPERVISCOUS OIL DEPOSIT IN LAYER-BY-LAYER NON-HOMOGENEOUS MANIFOLD WITH PARTIAL VERTICAL CONNECTIVITY | 2011 |
|
RU2473796C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF TWO WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431745C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL OR BITUMEN FIELD USING VERTICAL WELLS | 2020 |
|
RU2733862C1 |
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS | 2023 |
|
RU2810357C1 |
METHOD FOR DEVELOPING A LAYERED-ZONAL-HETEROGENEOUS DEPOSIT OF EXTRA-VISCOUS OIL OR BITUMEN WITH THE PRESENCE OF AN IMPERMEABLE INTERLAYER | 2021 |
|
RU2769641C1 |
Authors
Dates
2013-01-10—Published
2011-06-01—Filed