FIELD: mining.
SUBSTANCE: to the development passed with formation roof slashing, between extraction gates there transported are pneumatic chocks, which are laid into box-shaped coverings and covered with "П"-shaped supports, and at crossover of working face to the development crossed with working face, compressed air is supplied to pneumatic chocks, "П"-shaped supports are lifted, and after the working face crosses the development crossing the working face line, pneumatic chocks are unloaded, "П"-shaped supports are lowered to box-shaped covering, and pneumatic chocks are removed to extraction development.
EFFECT: improving the erection efficiency of artificial roof in the development crossed over with a working face.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WORKING CROSSING BY WORKING FACE COVERED BY FORMATION FOOTWALLING | 2010 |
|
RU2459080C1 |
PROTECTION METHOD OF DEVELOPMENT DRIFTS | 2009 |
|
RU2407892C1 |
PROTECTION METHOD OF DEVELOPMENT DRIFTS | 2007 |
|
RU2339817C1 |
METHOD OF PREVENTION OF DEVELOPMENT ENTRIES IN COAL BED AREAS | 2007 |
|
RU2341657C1 |
METHOD OF PROTECTING DEVELOPMENT WORKINGS IN WINNING OF COAL SEAMS | 2001 |
|
RU2188949C1 |
METHOD FOR TRANSITION OF GEOLOGICAL DISLOCATION OF DISJUNCTIVE TYPE BY STOPING FACE | 1991 |
|
RU2067173C1 |
METHOD OF PREPARING MINE WORKING TO ITS TRAVERSING BY MINE MACHINERY SET | 0 |
|
SU1064006A1 |
METHOD OF PREPARING TO MINING FLAT-LYING COAL SEAM | 1995 |
|
RU2086765C1 |
REMOVAL METHOD OF POWERED MINING FACE COMPLEXES | 2007 |
|
RU2384708C2 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
Authors
Dates
2013-01-20—Published
2011-07-29—Filed