FIELD: coal mining technology. SUBSTANCE: this relates to mining flat-lying coal seams with thickness of 1-2 m. According to method, created in sections of development workings is relieving zone, blast-holes are drilled in seam roof along line of stoping face between groups of power support units, anchors and upper beams of permanent support are installed. Full cross-section of underground workings is formed by blasting floor rocks with formation of gobbling strips between upper beams and installing posts of permanent support under them. Length of longwalls is calculated basing on amount of blasting floor rocks for each kind of workings. EFFECT: high efficiency. 1 cl, 18 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARING AND WORKING OUT LOW AND MIDDLE HOLLOW SEAM | 1994 |
|
RU2072046C1 |
METHOD OF MINING COAL SEAMS | 0 |
|
SU1728488A1 |
SHAFT-SINKING COMPLEX | 1990 |
|
RU2006584C1 |
METHOD FOR SUPPORT OF EXTRACTION DRIFTS | 1994 |
|
RU2069758C1 |
METHOD OF UNDERGROUND MINING OF BED DEPOSITS | 0 |
|
SU1460266A1 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
METHOD FOR WORKING GENTLY SLOPING COAL SEAMS | 0 |
|
SU1677314A1 |
METHOD OF PREPARING AND WORKING OF THICK PITCHING COAL BED | 2014 |
|
RU2555712C1 |
METHOD OF GUARDING OF WORKINGS IN HEAVING SOILS | 1990 |
|
RU2007577C1 |
METHOD FOR MINING OF THICK STEEP FIRE-HAZARDOUS COAL SEAMS | 1991 |
|
RU2011823C1 |
Authors
Dates
1997-08-10—Published
1995-02-27—Filed