FIELD: mining.
SUBSTANCE: before the face enters the formation roof, wells are drilled towards each other on the side of extraction gates, in pairs as to formation and parallel to the support line at the distance from the well projection to the bottom of formation to the nearest point of removal chamber, which is equal to 0.7-0.8 of periodic step of convergence of the main roof; they are charged and blasted after the support line, by means of which a support is created on the side of worked-out space for a hanging plate of the main roof throughout the length of face by using the roof rocks fallen during blasting operations. Coal pillar arranged between mechanised support and removal chamber is provided with artificial flexibility and extracted under protection of the plate of the main roof, which is borne against the rocks fallen during the well blasting operations. The specified artificial flexibility is provided for the pillar by drilling from removal chamber of wells at the formation roof towards the face.
EFFECT: considerable improvement of safe operations at entry of the complex into removal chamber in wide range of conditions of coal beds occurrence.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTROL METHOD OF POORLY CAVING ROOF AT MINING OF GAS-BEARING FORMATIONS IN FACES WITH MECHANISED COMPLEXES | 2011 |
|
RU2472931C1 |
METHOD TO MANAGE HARD-TO-COLLAPSE ROOF WHEN MINING GAS-BEARING BEDS IN LONG FACES WITH MECHANICAL COMPLEXES | 2011 |
|
RU2471989C1 |
COMPLEX METHOD OF PRELIMINARY DEGASSING OF WORKING COAL BED, WORKED-OUT AREA AND ACCOMPANYING BEDS AND CONTROLLED CAVING OF HEAVY ROOF | 2013 |
|
RU2540750C2 |
METHOD OF DIFFICULT-TO-CAVE ROOF CONTROL IN MINING OF COAL SEAMS BY POWERED MINING SET | 1996 |
|
RU2151293C1 |
METHOD FOR FORMING A DISMANTLING CHAMBER WHEN DEVELOPING SLIM COAL BEDS | 2020 |
|
RU2743162C1 |
METHOD OF WORKING PROTECTION | 0 |
|
SU1710746A1 |
PROCESS OF DEVELOPMENT OF THICK GENTLY DIPPING COAL FORMATIONS WITH ROOF ROCKS DIFFICULT TO FALL | 2002 |
|
RU2219341C1 |
PROCEDURE FOR WEAKENING MARGINAL MASSIF OF MINE WORKINGS AT DEVELOPMENT OF COAL BEDS | 2009 |
|
RU2396429C1 |
METHOD OF CONTROLLING SOLID ROOF WHEN WORKING GENTLY-SLOPING AND INCLINED COAL BEDS BY LONG PILLARS | 0 |
|
SU1004638A1 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
Authors
Dates
2013-01-20—Published
2011-07-28—Filed