FIELD: mining.
SUBSTANCE: modular support of vertical shaft includes reinforced-concrete modules with projections, which are located on edges; modules have lifting lugs and arched tubes; water removal system is arranged in the support body, and space between external projections of modules is filled with mixture of activated tailings of ore concentration of the first and the second turns, granules of foamed polystyrene and larger filler with the size of up to 20 mm.
EFFECT: reduction of installation labour intensity of modular support, creation of zone with adjustable deformation at action of pressure on the side of rocks and providing the controlled operating mode of the support under action of increased hydrostatic pressure.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
PRECAST SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2478789C1 |
VERTICAL STEM LINING | 2013 |
|
RU2521105C1 |
LINING OF VERTICAL SHAFT WITH CONTROLLED OPERATING CONDITIONS | 2012 |
|
RU2524082C1 |
LINING OF VERTICAL WELL BORE | 2013 |
|
RU2519279C1 |
METHOD FOR CONSTRUCTION OF PREFABRICATED-SOLID SUPPORT OF SHAFT OF MINING ENTERPRISE AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631061C1 |
METHOD FOR SINKING VERTICAL WELL BORES AND CORRESPONDING EQUIPMENT | 2015 |
|
RU2613999C2 |
METHOD OF VERTICAL AND INCLINED WORKINGS DRIVING AND SUPPORTING AND GUARD SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2607824C1 |
ENGINEERING CONSTRUCTION FOR FACILITIES OF UNDERGROUND ENERGY AND UNDERGROUND VERTICAL SECTIONS OF TRANSPORT SYSTEMS | 2014 |
|
RU2595255C2 |
SHAFT SINKING COMBINE | 2015 |
|
RU2600807C1 |
METHOD OF THE MINE SHAFT WITH A TUBING SUPPORT RECONSTRUCTION | 2017 |
|
RU2655712C1 |
Authors
Dates
2013-02-10—Published
2011-11-28—Filed