FIELD: mining.
SUBSTANCE: water conveyance ply including foamed polystyrene granules is arranged between load-bearing layer consisting of concrete with dressing tails activated in disintegrator as the binder, and plugged by rocks, and by availability of anchors fitted in adjacent massif.
EFFECT: notable decrease in load at inner steel shell and concrete layer, lower input of materials and costs, higher reliability and longer life.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
VERTICAL STEM LINING | 2013 |
|
RU2521105C1 |
DESIGN OF VERTICAL SHAFT SUPPORT WITH ADJUSTABLE MODE OF OPERATION | 2009 |
|
RU2433269C2 |
LINING OF VERTICAL WELL BORE | 2013 |
|
RU2519279C1 |
MODULAR SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2474693C1 |
MULTILAYER SUPPORT OF MINE WORKING | 0 |
|
SU1040157A1 |
PRECAST SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2478789C1 |
SUPPORT FOR SUBMERGED STRUCTURE | 2015 |
|
RU2584174C1 |
SUPPORT OF UNDERGROUND STRUCTURE | 2015 |
|
RU2583800C1 |
METHOD OF SUPPORTING MINE WORKINGS | 0 |
|
SU1507895A1 |
ROOF SUPPORT FOR MINE WORKINGS | 0 |
|
SU939767A1 |
Authors
Dates
2014-07-27—Published
2012-12-04—Filed