FIELD: mining.
SUBSTANCE: outer layer is made of shotcrete, the main load-bearing structure is built from reinforced concrete blocks, without connection of the rings between each other, the elements of the water disposal system are passed through the holes in the reinforced concrete blocks, and the steel shell is placed between a layer of high-strength fibre-reinforced concrete and the main load-bearing structure.
EFFECT: increase in bearing capacity of the lining, decrease in steel consumption, providing the ability for exploitation of the well bore during undermining.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
VERTICAL STEM LINING | 2013 |
|
RU2521105C1 |
LINING OF VERTICAL SHAFT WITH CONTROLLED OPERATING CONDITIONS | 2012 |
|
RU2524082C1 |
DESIGN OF VERTICAL SHAFT SUPPORT WITH ADJUSTABLE MODE OF OPERATION | 2009 |
|
RU2433269C2 |
PRECAST SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2478789C1 |
SMOOTH-WALL TUBING FOR SUPPORTING UNDERGROUND WORKINGS DRIVEN IN PERMAFROST | 1996 |
|
RU2105152C1 |
SUPPORT FOR SUBMERGED STRUCTURE | 2015 |
|
RU2584174C1 |
LINING OF MINE SHAFT | 1996 |
|
RU2110689C1 |
MODULAR SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2474693C1 |
SUPPORT OF UNDERGROUND STRUCTURE | 2015 |
|
RU2583800C1 |
METHOD OF VERTICAL AND INCLINED WORKINGS DRIVING AND SUPPORTING AND GUARD SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2607824C1 |
Authors
Dates
2014-06-10—Published
2013-03-05—Filed