FIELD: oil and gas industry.
SUBSTANCE: recording of signals is performed at the central monitoring point through a communication line from measuring units of workstations arranged in diagnostics places along the route. In location places of stress-and-strain state sensors the measured mechanical stresses are compared to values of allowable compressive and tensile stresses, and as per the comparison results, the decision is taken on the necessity of performing emergency prevention activities.
EFFECT: improving diagnostics reliability of stress-and-strain state of the pipeline and possibility of predicting hazardous geodynamic processes.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TECHNICAL MONITORING AND ESTIMATE OF MAIN PIPELINE AND SYSTEM FOR IMPLEMENTATION THEREOF | 2011 |
|
RU2451874C1 |
ANCHORED PROFILING UNDERWATER OBSERVATORY | 2015 |
|
RU2617525C1 |
METHOD FOR MONITORING AND FORECASTING LANDSLIDE HAZARD | 2018 |
|
RU2686383C1 |
COMPUTER-AIDED SYSTEM OF MONITORING RAIL FREIGHTAGE | 2010 |
|
RU2466460C2 |
HIGH-AUTONOMY HARDWARE TELEMETRY COMPLEX FOR COLLECTING AND TRANSMITTING STREAMING AND TELEMETRY DATA VIA SELF-ORGANISATION WIRELESS NETWORKS INCLUDING A SATELLITE SEGMENT | 2022 |
|
RU2788302C1 |
ANCHORED PROFILING UNDERWATER OBSERVATORY | 2014 |
|
RU2545159C1 |
METHOD OF MONITORING AND PREDICTING FAULTS IN TOP PART OF GEOLOGICAL SECTION | 2011 |
|
RU2461848C1 |
SYSTEM OF CONTROL OF VITAL INDICES OF PATIENT'S HEALTH | 2010 |
|
RU2454924C2 |
PROCESS OF REMOTE TEST AND DIAGNOSTICS OF STATE OF STRUCTURE OF PIPE-LINES AND GEAR FOR ITS IMPLEMENTATION | 1996 |
|
RU2146810C1 |
HARDWARE AND SOFTWARE SYSTEM FOR MONITORING CORROSION PROTECTION OF UNDERGROUND STRUCTURES | 2013 |
|
RU2580610C2 |
Authors
Dates
2013-02-10—Published
2011-07-07—Filed