FIELD: oil and gas industry.
SUBSTANCE: method and system involve control of pump in well for formation of oil flow from underground header to ground surface and change in speed of pumping with frequency from about 0.02 to about 0.5 Hz to generate pressure wave overspread to the header.
EFFECT: improving efficiency of oil production method and reliability of operation of the system for oil production.
18 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RETARDING DAMAGE OF FORMATION EXPOSED SURFACE IN GAS AND OIL WELLS (VERSIONS) AND SYSTEM TO THIS END | 2008 |
|
RU2470145C2 |
HORIZONTAL VERTICAL PUMP SYSTEM FOR EXTRACTING WELL FLUID MEDIUM | 2012 |
|
RU2650983C2 |
PRODUCTION SIMULATION METHOD AND SYSTEM | 2012 |
|
RU2567067C1 |
SIMULATION METHOD OF OIL EXTRACTION FROM OIL WELL | 2011 |
|
RU2479712C2 |
USE OF ALKALI METAL SILICIDES IN POST-CHOPS OILFIELD RECOVERY OPERATIONS | 2014 |
|
RU2679027C2 |
METHOD AND DEVICE FOR OIL RECOVERY INCREASE | 2006 |
|
RU2312980C1 |
METHOD OF HYDROCARBONS EXTRACTION FROM RESERVOIR AND HYDROCARBONS EXTRACTION PLANT | 2010 |
|
RU2530175C2 |
IMPROVEMENT IN FLUID MEDIA IN EXTRACTION FROM RESERVOIR BEDS | 2015 |
|
RU2688991C2 |
IMPROVEMENT DURING TRANSPORTATION OF FLUIDS FROM WELLS | 2015 |
|
RU2693975C2 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT IN SLIGHTLY CEMENTED BEDS | 2007 |
|
RU2354818C2 |
Authors
Dates
2013-02-20—Published
2008-09-09—Filed