SYSTEM AND METHOD FOR PERFORMING DOWNHOLE STIMULATION OPERATIONS Russian patent published in 2018 - IPC E21B44/00 E21B43/26 G06G7/50 G06F17/50 

Abstract RU 2663011 C2

FIELD: soil or rock drilling; mining.

SUBSTANCE: group of inventions relates to methods for performing stimulation operations at a wellsite having a subterranean formation with of a reservoir therein. Method involves generating a plurality of quality indicators from a plurality of logs, and combining the plurality of quality indicators to form a composite quality indicator. Plurality of stress blocks may then be merged using diversion criterion. Composite quality indicator may be combined with the merged stress blocks to form a combined stress and composite quality indicator, comprising a plurality of blocks with boundaries therebetween. Method may further comprise defining stages along the combined stress and composite quality indicator based on the diverter-assisted stage classifications and selectively positioning perforations in select stages based on the diverter-assisted stage classifications thereon.

EFFECT: technical result is higher intensification of production from a well.

18 cl, 23 dwg

Similar patents RU2663011C2

Title Year Author Number
PRODUCTION SIMULATION METHOD AND SYSTEM 2012
  • Chuprakov Dmitry Arefievich
  • Prioul Romain Charles Andre
  • Weng Xiaowei
  • Kresse Olga
  • Gu Hongren
RU2567067C1
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION 2011
  • Onda Khitosi
  • Ganguli Utpal
  • Vehn Sjaovehj
RU2561114C2
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION 2011
  • Ganguli Utpal
  • Onda Khitosi
  • Vehn Sjaovehj
RU2569116C2
METHOD FOR FORECASTING CHANGE IN PRODUCTION RATE OF PRODUCTION WELLS DURING PROPAGATION OF ELASTIC VIBRATIONS IN BOTTOMHOLE FORMATION ZONE 2020
  • Ryabokon Evgenij Pavlovich
  • Turbakov Mikhail Sergeevich
RU2740597C1
METHOD FOR IMPLEMENTING HYDRAULIC FRACTURING AND BRINGING A WELL TO PRODUCTION 2022
  • Bannikov Denis Viktorovich
  • Velikanov Ivan Vladimirovich
  • Isaev Vadim Ismailovich
  • Semin Leonid Georgievich
  • Ivanov Maksim Grigorevich
RU2798193C1
MULTISTAGE OIL FIELD DESIGN OPTIMISATION UNDER UNCERTAINTY 2015
  • Dikpesse Khyug A.
  • Rashid Kashif
  • Bejli Uillyam Dzh.
  • Prendzh Majkl Devid
  • Kue Benua
RU2669948C2
SYSTEM AND METHOD OF CORRECTION OF WELL SHAFT DIRECTION BASED ON STRESS FIELD 2008
  • Mus Daniel
  • Khassan Gamal' A.
  • Dzhordzhi Daniel T.
  • Kastillo Dejvid A.
  • Fejb'An Dzhon
RU2496003C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING 2008
  • Doz'Er Dzhorzh K.
RU2489571C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1

RU 2 663 011 C2

Authors

Leserf Bryuno

Usoltsev Dmitrij

Poup Timoti L.

Pena Alekhandro

Itibrout Tarik

Ven Syaovej

Onda Khitosi

Enkababian Filipp

Dates

2018-08-01Published

2014-12-01Filed