FIELD: oil and gas industry.
SUBSTANCE: invention refers to transporting samples of fluid mediums and/or rheological measurements to surface of division. According to one of versions the method consists in circulating heated fluid medium in the first region of the reservoir bed wherein a composition of heavy oil is present or considered present with implementation of a pump assembled on the surface and an installation for well completion containing a well pump and a sampling tool within the period of time and at consumption adequate for obtaining fluid composition of heavy oil; then sampling of fluid composition of heavy oil is performed by means of the sampling tool.
EFFECT: facilitation of sampling from reservoir bed by means of device or its part used for supply of heat into reservoir bed region in question.
20 cl, 14 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL DRILLING TOOL, TOOL FOR EVALUATION OF PARAMETRES OF FORMATION AND EVALUATION METHOD OF PARAMETRES OF FORMATION BY MEANS OF WELL TOOL | 2006 |
|
RU2404361C2 |
METHOD TO DO OPERATIONS IN WELL SHAFT USING DOWNHOLE TOOLS WITH MOVING SECTIONS (VERSIONS) | 2008 |
|
RU2471067C2 |
INJECTION FOR SAMPLING HEAVY OIL | 2013 |
|
RU2613373C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2658400C1 |
METHODS, SYSTEMS AND DEVICE FOR TEST ON FLEXIBLE TUBING STRING | 2006 |
|
RU2391502C2 |
METHOD AND DEVICES FOR SAMPLING HEAVY OIL FROM UNDERGROUND RESERVOIR | 2008 |
|
RU2464419C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2664989C1 |
DEVICE TO DETERMINE FORMATION CHARACTERISTICS (VERSIONS) | 2005 |
|
RU2378511C2 |
SAMPLE CAPTURE PRIORITISATION | 2012 |
|
RU2598390C2 |
SOUNDING ELECTRODE ASSEMBLY (VERSIONS) AND UNDERGROUND RESERVOIR FLUID MEDIUM SAMPLING METHOD USING SOUNDING ELECTRODE ASSEMBLY | 2005 |
|
RU2379506C2 |
Authors
Dates
2009-04-10—Published
2007-08-21—Filed