FIELD: construction.
SUBSTANCE: system to dry and monitor condition of a landslide slope, providing safety during drilling operations when building a drainage device of a landslide slope drying system includes a drainage device in the form of a perforated pipeline built by the method of horizontal directional drilling. It comprises a system of landslide slope condition monitoring consisting of two or more (if required) devices to track landslide motion, which are installed in the landslide and register and transmit information about motion or condition of a landslide slope to a station that receives data on motion of a landslide, and such station is available at the driller's panel.
EFFECT: provision of safety of people and mechanisms, preservation of stable condition of a landslide slope during drilling operations when building a drainage device of a landslide slope drying system, higher efficiency of works.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREVENTION OF LANDSLIP FORMATION | 2011 |
|
RU2468146C1 |
METHOD FOR MONITORING AND FORECASTING LANDSLIDE HAZARD | 2018 |
|
RU2686383C1 |
BUILDING STRUCTURE TO PROTECT OBJECTS OF CIVIL AND INDUSTRIAL CONSTRUCTION AGAINST DAMAGE IN CASE OF SLIDING IN UNSTABLE SOILS | 2008 |
|
RU2409726C2 |
METHOD OF MONITORING HAZARDOUS GEODYNAMIC PROCESSES | 2011 |
|
RU2467287C2 |
LANDSLIDE PROTECTION WORKS | 2010 |
|
RU2452816C1 |
LANDSLIDE PROTECTION WORKS | 2008 |
|
RU2380485C1 |
TECHNOLOGY TO STABILISE SLIDE SLOPES WITH STREAMLINED DEWATERING WELLS | 2010 |
|
RU2421573C1 |
SLIDING SLOPE CONSOLIDATION METHOD | 2004 |
|
RU2275467C1 |
SLUMP SLOPE REINFORCEMENT METHOD | 2007 |
|
RU2340729C1 |
ANTI- LANDSLIDE STRUCTURE FOR EARTHWORK SLOPES AND INCLINES STABILIZATION | 2002 |
|
RU2229560C2 |
Authors
Dates
2013-04-20—Published
2011-03-02—Filed