FIELD: mining.
SUBSTANCE: method involves drilling of a transport tunnel from the open pit on horizon below the developed ore deposit, loading of mined rock from the ore deposit to mine dump trucks and delivery of mined rock with mine dump trucks via the transport tunnel to its portal located on the open pit side, transshipment at the transshipment point of mined rock from mine dump trucks to the open pit transport. Section of transport tunnel, which is located under outlines of ore deposit, is horizontal, and the rest section of the transport tunnel, which is interconnected with its portal, is inclined. Portal of the transport tunnel is arranged below horizontal section of transport tunnel and transshipment point above it. Transshipment point is connected to horizontal section of the transport tunnel via an inclined transport access track. Movement of mine dump trucks along the inclined transport access track for loading of mined rock and mine truck dumps loaded with mined rock via an inclined section of the transport tunnel is performed by self-operation under action of gravity force, in compliance with the programmed mode.
EFFECT: reduction of operating costs for transportation of broken mined rock via underground mine workings; reduction of costs for their ventilation with simultaneous improvement of environmental situation.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MONITORING METHOD OF STATE OF MINE WORKINGS | 2011 |
|
RU2479718C2 |
METHOD OF COMBINED OPEN-CUT AND UNDERGROUND STEEPLY PITCHING DEPOSIT DEVELOPMENT | 2005 |
|
RU2278261C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
INTRA-BOARD TRANSFER POINT FOR DEEP PITS OF AREAL FORM | 2015 |
|
RU2584173C1 |
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
METHOD TO DETECT PRESENCE OF HAZARDOUS SUBSTANCE IN MINE AIR OF PIT WORK AREAS | 2005 |
|
RU2286460C1 |
METHOD OF OPEN-CAST MINING OF ORE DEPOSITS | 0 |
|
SU1476135A1 |
Authors
Dates
2013-04-20—Published
2011-12-06—Filed