FIELD: mining, particularly means or methods for preventing, binding, depositing, or removing dust; preventing explosions or fires.
SUBSTANCE: method involves preliminarily measuring hazardous substance content in exhaust cloud created as a result of mine transport equipment operation in different modes; defining relation between hazardous substance content in exhaust cloud and mine transport equipment operation mode indexes; measuring meteorological air parameters and hazardous substance content at pit edge and inside the pit; determining relation between meteorological air parameters and hazardous substance content in mine air and hazardous substance content in air at pit edge; measuring operational mode parameters and determining mine transport location in pit; defining hazardous substance content in exhaust mine transport equipment cloud inside pit from predetermined relation; simultaneously measuring meteorological air parameters and hazardous substance content in air at pit edge; determining content of hazardous substances in mine air from predetermined relation; defining hazardous substance content in mine air in pit working areas by summing indexes characterizing hazardous substance content in exhaust mine transport equipment cloud inside pit and than characterizing hazardous substance content in mine air.
EFFECT: increased efficiency of meteorological air parameter and hazardous substance content measurement in different pit areas.
2 cl, 9 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
TRANSPORTATION METHOD OF MINED ROCK FROM UNDERGROUND STOPES IN NEAR-BORDER MASS OF OPEN PIT | 2011 |
|
RU2479719C2 |
METHOD FOR CONTROL OF LORRIES IN OPEN PITS DURING SELECTIVE ORE EXTRACTION AND SYSTEM FOR AUTOMATIC CONTROL OF ORE DELIVERY BY MEANS OF EXCAVATOR-LORRY COMPLEX | 1996 |
|
RU2100844C1 |
DEVICE FOR SUPPRESSING DUST AND GAS EMISSIONS IN QUARRY | 2023 |
|
RU2804919C1 |
METHOD FOR FORMATION OF OPEN PIT TRANSFER POINT | 1992 |
|
RU2039267C1 |
METHOD FOR DIFFERENTIATED AUTOMATED LOADING OF MINED ROCK INTO DUMP-TRUCKS DURING CONTINUOUS OPERATION OF EXTRACTION UNIT AND AUTOMATED SYSTEM FOR REALISING SAID METHOD | 2015 |
|
RU2595115C1 |
PROCESS OF DEVELOPMENT OF DEEP STRIPPING | 2000 |
|
RU2199664C2 |
METHOD FOR OPEN-PIT MINING OF MINERAL DEPOSITS USING SURFACE MINERS | 2022 |
|
RU2790308C1 |
METHOD FOR EXPLOITATION OF DEEP OPEN CUTS | 1993 |
|
RU2066760C1 |
DEVICE FOR CLEANING BODIES OF OPEN-PIT DUMP TRUCKS | 2008 |
|
RU2356762C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
Authors
Dates
2006-10-27—Published
2005-06-07—Filed