FIELD: mining.
SUBSTANCE: separate excavation of soil layer and overburden rocks, their movement and stocking into individual strip dumps is performed; open-pit field development, laying and levelling of overburden rocks and their compaction is performed to form an impervious screen. Then, backfill material is added, which consists of a mixture of overburden rocks and non-organic wastes - dust of electrostatic precipitators from cement production and citrogypsum from production of citric acid in the following ratio (wt %): overburden rocks : dust of electrostatic precipitators from cement production : citrogypsum = 2 : (1 - 1.5): (0.2 - 0.3).
EFFECT: reduction of adverse effect on the environment owing to avoiding open-area storage of wastes, and production of citric acid, and their use as part of backfill material during recultivation of open pits.
1 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MATERIAL FOR RECLAMATION OF DISTURBED LANDS | 2015 |
|
RU2603907C1 |
METHOD FOR RECLAMATION OF DISTURBED LANDS | 2008 |
|
RU2374447C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
METHOD FOR OPEN PIT MINING OF MINERALS | 0 |
|
SU1661425A1 |
METHOD OF QUARRIES RECLAMATION (VERSIONS) | 2010 |
|
RU2433268C1 |
METHOD OF RECULTIVATION OF LANDS DISTURBED DURING DEVELOPMENT OF ORE DEPOSITS OF MINERAL RESOURCES | 2019 |
|
RU2711926C1 |
PROCEDURE OF FORMING AND PREPARING OF EXTERNAL DUMPS AND BORROW CUTS FOR BIOLOGICAL RE-CULTIVATION | 2007 |
|
RU2359127C2 |
MATERIAL FOR RECLAMATION OF SOLID DOMESTIC WASTE LANDFILLS AND QUARRIES | 2013 |
|
RU2536062C1 |
METHOD TO RECOVER ABANDONED PITS | 2010 |
|
RU2443865C1 |
METHOD OF COMBINING OPERATIONS FOR EXTRACTION OF MINERALS AND RESTORATION OF LANDS DURING DEVELOPMENT OF STEEP-DIPPING DEPOSITS | 2019 |
|
RU2719894C1 |
Authors
Dates
2013-04-20—Published
2011-10-24—Filed