FIELD: mining.
SUBSTANCE: flattening of quarry sides is done bottom-up by means of their filling by application of stronger rocks taken from the bottom of the quarry. Filling may be carried out up to various vertical elevations at the board of the quarry depending on mine technical conditions of deposit bedding.
EFFECT: accelerated process of damaged lands recovery by increasing stability of flattened boards of the quarry to erosion processes, by arrangement of water reservoirs in the mined area with parameters favourable for recovery of their biological productivity.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMATION AND RECLAMATION OF SIDES OF SHALLOW PITS | 2015 |
|
RU2593857C1 |
METHOD TO MINE BED DEPOSITS | 2012 |
|
RU2490464C1 |
METHOD OF MECHANICAL AND HYDRAULIC RECULTIVATION OF LANDS | 2014 |
|
RU2569146C1 |
METHOD FOR RECLAMATION OF DISTURBED LANDS | 2008 |
|
RU2374447C1 |
RESTORATION METHOD OF DISTURBED LANDS AT OPEN DEVELOPMENT OF DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2444628C1 |
RECULTIVATION METHOD OF OPEN PITS USING INDUSTRIAL WASTES | 2011 |
|
RU2479721C1 |
RECLAMATION METHOD OF DISTURBED LANDS | 2018 |
|
RU2715768C2 |
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
METHOD OF PITS CONSERVATION WITH FLOODING OF SELECTED AREA | 2010 |
|
RU2451179C1 |
METHOD FOR RECULTIVATION OF SLOPES IN OPENCAST MINING OF MINERAL DEPOSITS | 1995 |
|
RU2088760C1 |
Authors
Dates
2011-11-10—Published
2010-04-12—Filed