FIELD: oil and gas industry.
SUBSTANCE: in the course of deposit development there drilled are horizontal production and injection wells by pairs parallel to each other one above the other, heat-transfer medium is pumped through injection wells and the product is extracted through production wells. Prior to drilling the pairs of horizontal wells, along the future horizontal bores there drilled are vertical exploratory bores alternatively from one and the other side at a distance of 10-30 m from future trajectory of horizontal bores with the distance between vertical exploratory bores 80-120 m. The profile of production oil horizon bedding and the profile of water-oil contact are defined by exploratory bores. Vertical exploratory bores are eliminated. The bottom horizontal bore of production well is drilled under water-oil contact. At the deposit there marked are the following horizontal bores of production and injection wells mainly parallel to the drilled horizontal bores. In the course of drilling of the next horizontal bores there performed are operations like drilling the first bores with location of the following bores mainly in parallel at the distance of 80-120 m from the drilled horizontal bores.
EFFECT: increasing oil recovery of deposit.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MASSIVE TYPE HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334096C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2596845C1 |
METHOD FOR DEVELOPMENT OF ASH-NONUNIFORM DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2017 |
|
RU2640608C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2599124C1 |
METHOD OF OIL POOL DEVELOPMENT WITH GAS CAP AND BOTTOM WATER | 2008 |
|
RU2386804C1 |
DEVELOPMENT METHOD OF SUPER-VISCOUS OIL DEPOSIT | 2018 |
|
RU2695206C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HIGHLY VISCOUS OIL OR BITUMEN | 2017 |
|
RU2657307C1 |
DEVELOPMENT METHOD OF LAYER-BY-ZONAL HETEROGENEOUS SUPERVISCOUS OIL OR BITUMEN | 2015 |
|
RU2582251C1 |
METHOD FOR DEVELOPMENT OF LAYER-BY-LAYER-ZONAL-HETEROGENEOUS DEPOSITS OF SUPER-VISCOUS OIL OR BITUMEN | 2021 |
|
RU2761799C1 |
METHOD FOR DEVELOPMENT OF EXPLORED OIL DEPOSIT | 2015 |
|
RU2587661C1 |
Authors
Dates
2013-05-10—Published
2012-07-23—Filed