FIELD: information technologies.
SUBSTANCE: address is executed to a policy of system resources planning for operations of planning in a work load. The policy is set on the basis of the work load in such a manner that the policy depends on the workload. System resources are backed up for the work load in accordance with the policy. Backups may be of hierarchical nature, besides, the work loads are also hierarchically ordered. Besides, dispatching mechanisms for dispatching of work loads at system resources may be realised regardless of policies. Feedback in respect to usage of system resources may be used to determine selection of a policy for control of dispatching mechanisms.
EFFECT: enhanced efficiency of system resources planning.
19 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
POWER-SAVING STREAM SCHEDULING AND DYNAMIC USE OF PROCESSORS | 2009 |
|
RU2503987C2 |
METHOD OF FUNCTIONING COMPUTER DEVICE OPERATING SYSTEM OF SOFTWARE AND HARDWARE COMPLEX | 2016 |
|
RU2626350C1 |
SUPPORTING MULTIPLE ACCESS TECHNOLOGIES IN WIRELESS COMMUNICATION ENVIRONMENT | 2009 |
|
RU2504919C2 |
ARCHITECTURE, PROGRAMMING MODEL AND API | 2005 |
|
RU2463650C2 |
PROTECTION OF OPERATING SYSTEM RESOURCES | 2007 |
|
RU2462747C2 |
METHOD FOR ARRANGING WORKLOADS IN A PROGRAM-DEFINED AUTOMATED SYSTEM | 2016 |
|
RU2730534C2 |
JOB SCHEDULING AND MONITORING | 2015 |
|
RU2707389C2 |
SYSTEM AND METHOD FOR TARGET INSTALLATION OF CONFIGURED SOFTWARE | 2012 |
|
RU2523113C1 |
TRANSIT DATA EXCHANGE FOR CONTROLLING INTERFERENCE | 2008 |
|
RU2441333C2 |
SOFTWARE-DEFINED AUTOMATED SYSTEM AND ARCHITECTURE | 2016 |
|
RU2729885C2 |
Authors
Dates
2013-05-10—Published
2008-10-07—Filed