FIELD: oil and gas industry.
SUBSTANCE: when the method is being realised, at least one container is installed on the lowered equipment and then lowered to the well to the pre-determined distance from the well head and it includes a tracer mark, with further monitoring of wellbore fluid or gas for content of the tracer mark. The container housing is made from the material capable of being dissolved or decomposed under action of water or gas and resistant to action of hydrocarbon medium.
EFFECT: increasing the obtained information on filtration in the formation and on ongoing processes in the well with concretisation in time and space.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF YIELD DETERMINATION OF WATER, OIL, GAS USING FLOW METER | 2014 |
|
RU2569143C1 |
METHOD FOR DETERMINING THE FLOW RATE OF WATER, OIL, GAS | 2018 |
|
RU2685601C1 |
METHOD FOR DETERMINATION OF WELL FLUID INFLUX FROM SEPARATE WELL INTERVALS | 2019 |
|
RU2702446C1 |
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCERS OR INJECTORS | 2013 |
|
RU2544923C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCTION OR INJECTION BOREHOLES | 2017 |
|
RU2658697C1 |
METHOD FOR DETERMINING INFLOW PROFILE OF OIL AND GAS PRODUCING WELLS USING MARKER DIAGNOSTICS | 2021 |
|
RU2810391C2 |
METHOD FOR MONITORING PRODUCING HORIZONTAL BOREHOLES | 2021 |
|
RU2781311C1 |
MONITORING METHOD FOR HORIZONTAL AND DIRECTIONAL DEVELOPMENT OR INJECTION WELLS | 2015 |
|
RU2622974C2 |
METHOD OF DEVELOPING OIL AND GAS DEPOSITS | 2015 |
|
RU2610485C1 |
Authors
Dates
2013-05-20—Published
2011-07-12—Filed