METHOD FOR DETERMINING THE FLOW RATE OF WATER, OIL, GAS Russian patent published in 2019 - IPC E21B47/11 

Abstract RU 2685601 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to the field of oil and gas industry, in particular to the field of operation of field wells, and can be used in development of oil, gas and gas condensate deposits, in particular for determination of phase well flow rates. According to the method, at least one container comprising at least one matrix made from a material with different solubility in a formation fluid of different composition and containing trace particles dispersed in the matrix material in the form of particles with different physical and chemical properties, is installed at required depth and / or in wellhead with provision of contact with produced formation fluid. Solubility of the matrices in model solutions with different ratios of water, liquid hydrocarbon and natural gas and depending on the flow rate is pre-determined. At that, the container can be made with the possibility of replacement as the matrix dissolution, as well as release from the matrix, when it interacts with formation fluid, tracer marks and / or using an external control signal, including after well shutdown. At that, the container is designed to be used in working or in new wells as part of a camera built into filters or pipes, or in the composition of the camera in form of a separate device in the composition, wherein flow rates of water, oil and gas are calculated based on analysis of tracer marks registered at well exit and using previously determined solubility of matrices in model solutions.

EFFECT: technical result achieved during implementation of the developed method consists in increasing the obtained information on filtration in the formation and on actual processes in the well with instantiation in space and time with simultaneous increase of accuracy and simplification of the method.

10 cl

Similar patents RU2685601C1

Title Year Author Number
METHOD OF YIELD DETERMINATION OF WATER, OIL, GAS USING FLOW METER 2014
  • Zhuravlev Oleg Nikolaevich
  • Nukhaev Marat Tokhtarovich
  • Shchelushkin Roman Viktorovich
RU2569143C1
METHOD FOR DETERMINATION OF WELL FLUID INFLUX FROM SEPARATE WELL INTERVALS 2019
  • Zhuravlev Oleg Nikolaevich
RU2702446C1
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT 2011
  • Zhuravlev Oleg Nikolaevich
RU2482272C2
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCERS OR INJECTORS 2013
  • Zhuravlev Oleg Nikolaevich
  • Nukhaev Marat Tokhtarovich
  • Shchelushkin Roman Viktorovich
RU2544923C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD 2014
  • Zhuravlev Oleg Nikolaevich
  • Nukhaev Marat Tokhtarovich
  • Shchelushkin Roman Viktorovich
RU2594235C2
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCTION OR INJECTION BOREHOLES 2017
  • Zhuravlev Oleg Nikolaevich
RU2658697C1
METHOD OF QUALITATIVE AND QUANTITATIVE ESTIMATION OF DOWNHOLE GAS INFLOWS IN MULTISTAGE HYDRAULIC FRACTURING IN A MULTIPHASE FLOW SYSTEM 2020
  • Guryanov Andrej Valerevich
  • Buzin Pavel Vladimirovich
  • Gazizov Ruslan Rashidovich
  • Suprankov Kirill Andreevich
  • Medvedev Evgenij
RU2749223C1
METHOD FOR DETERMINING INFLOW PROFILE OF OIL AND GAS PRODUCING WELLS USING MARKER DIAGNOSTICS 2021
  • Gurianov Andrei Valerevich
  • Suprankov Kirill Andreevich
  • Gazizov Ruslan Rashidovich
  • Buzin Pavel Vladimirovich
  • Maliavko Evgenii Aleksandrovich
RU2810391C2
METHOD FOR MONITORING PRODUCING HORIZONTAL BOREHOLES 2021
  • Zhuravlev Oleg Nikolaevich
  • Volkov Dmitrij Alekseevich
  • Shajmardanov Anet Fajruzovich
RU2781311C1
MONITORING METHOD FOR HORIZONTAL AND DIRECTIONAL DEVELOPMENT OR INJECTION WELLS 2015
  • Zhuravlev Oleg Nikolaevich
  • Shchelushkin Roman Viktorovich
RU2622974C2

RU 2 685 601 C1

Authors

Zhuravlev Oleg Nikolaevich

Dates

2019-04-22Published

2018-06-26Filed