FIELD: oil and gas industry.
SUBSTANCE: method for determining the flow rate and the density of formation fluid of oil formations consists in shaping of signals when a sensitive element passes through the specified levels in the well. Measurement of time intervals between signals, with further calculation of the flow rate of the formation in relation to distance between specified levels to time interval between the appropriate pulses. Measurement of movement speed of several sensitive elements is performed. Flow rate of each next above-lying oil formation or layer is determined as difference between previous and current measurements. Density of formation fluid is determined as integral density value of the last sensitive element that floated up to the surface and that one that did not float up to the surface.
EFFECT: improving measurement reliability of flow rate and density of formation fluid.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING WATER CONTENT OF OIL WELL PRODUCT | 2015 |
|
RU2595103C1 |
METHOD OF DETERMINING FLOW RATE OF FORMATION FLUID IN WELL | 0 |
|
SU1151667A1 |
METHOD OF LOCATING PRODUCTIVE INTERVALS IN OIL POOLS | 0 |
|
SU1624141A1 |
METHOD OF DETERMINING PHASE DEBITS IN OIL WELL | 1996 |
|
RU2097554C1 |
METHOD FOR DETERMINATION OF INFLUX PROFILE AND BOREHOLE ENVIRONMENT PARAMETERS IN MULTILAY WELL | 2009 |
|
RU2505672C1 |
METHOD OF DIRECTIONAL LOADING OF THE PLAST | 2016 |
|
RU2645684C1 |
METHOD OF DETERMINATION OF FLUID-MOVEMENT PROFILE AND PARAMETERS OF NEAR-WELLBORE | 2010 |
|
RU2455482C2 |
METHOD FOR DETERMINING HYDRODYNAMIC PARAMETERS OF PRODUCTIVE FORMATION | 2017 |
|
RU2669980C1 |
METHOD FOR DUAL OPERATION OF WATER-PRODUCING WELL EQUIPPED WITH ELECTRIC CENTRIFUGAL PUMP | 2012 |
|
RU2513796C1 |
METHOD FOR MONITORING THE ORIGIN OF THE EXTRACTED BOREHOLE FLUID | 2021 |
|
RU2778869C1 |
Authors
Dates
2013-06-10—Published
2011-09-30—Filed