FIELD: oil and gas industry.
SUBSTANCE: preparation method of backfill compound for repair insulation work involves mixing of acetone-formaldehyde resin with caustic soda and water. At that, there preliminarily prepared is water solution of caustic soda by mixing the latter with water; water solution of caustic soda is divided into two equal portions; the first portion of water solution of caustic soda is introduced to acetone-formaldehyde resin; the obtained mixture is mixed till indiscrete mass is obtained and exposed for 60-120 minutes. While mixing, the second portion of water solution of caustic soda is introduced at the following reagent ratio, wt %: acetone-formaldehyde resin 80-95, caustic soda 1-2, water is the rest.
EFFECT: improving efficiency and quality of repair insulation work owing to controlling curing periods of backfill compound at simultaneous reduction of influence of exothermic effect of reaction at its preparation; increasing strength of cured backfill compound.
5 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSULATE ABSORPTION ZONE IN WELL | 2010 |
|
RU2447258C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
METHOD OF PRODUCTION STRING SEALING | 2013 |
|
RU2520217C1 |
POLYMER COMPOUND | 2006 |
|
RU2333347C1 |
METHOD FOR PLUGGING OF LOST-CIRCULATION ZONES | 2012 |
|
RU2506409C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2018 |
|
RU2684932C1 |
METHOD FOR WATER INFLUX ISOLATION AND RESTRICTION IN WELL | 2004 |
|
RU2272905C1 |
METHOD OF INSULATION AND RESTRICTION OF WATER PRODUCTION IN WELLS | 2008 |
|
RU2370630C1 |
COMPOSITION FOR MAINTENANCE AND ISOLATION OPERATIONS IN WELLS | 2003 |
|
RU2250983C1 |
METHOD OF SHUT-OFF AND RESTRAINT OF WATER PRODUCTION IN WELLS | 2007 |
|
RU2349731C2 |
Authors
Dates
2013-06-20—Published
2011-12-29—Filed