FIELD: oil and gas production.
SUBSTANCE: method consists in pumping insulating material into pressure and producing wells on base of polymer solidificated under bed conditions, in forcing it through into bed and in curing it for period of solidification and acquisition of hardness. Polymer of the following composition, vol %, is used as insulating material: resin acetone-formaldehyde - 63.0; resin phenol formaldehyde - 27.0; 2-40% water solution of alkali - 10.0.
EFFECT: elimination of toxic reagents use and reduced influence of exothermic effect to safe level at preparation of big volumes of composition in field.
1 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WATER INFLUX ISOLATION AND RESTRICTION IN WELL | 2004 |
|
RU2272905C1 |
RESERVOIR ISOLATION METHOD | 2004 |
|
RU2272892C1 |
METHOD OF BINDING BOTTOMHOLE ZONE OF FORMATION | 2007 |
|
RU2352764C2 |
METHOD OF SHUT-OFF AND RESTRAINT OF WATER PRODUCTION IN WELLS | 2007 |
|
RU2349731C2 |
PLASTIC COMPOSITION FOR ISOLATION AND LIMITATION OF WATER INFLOW INTO WELLS | 2020 |
|
RU2761037C1 |
METHOD OF REMEDIAL CEMENTING OPERATIONS IN WELL | 2017 |
|
RU2640854C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
METHOD FOR POLYMERIC GEL-FORMING COMPOSITION CHOICE TO INCREASE RESERVOIR RECOVERY AND PERFORM WATERPROOFING WORKS | 2004 |
|
RU2272899C1 |
PREPARATION METHOD OF BACKFILL COMPOUND FOR REPAIR INSULATION WORK | 2011 |
|
RU2485285C1 |
FORMULATION TO SHUT OFF WATER INFLOW INTO PRODUCING WELL AND TO CONTROL INTAKE CAPACITY PROFILE OF INJECTING WELLS | 2005 |
|
RU2293102C1 |
Authors
Dates
2009-10-20—Published
2008-01-22—Filed