FIELD: construction.
SUBSTANCE: device comprises mobile facilities, where equipment is installed for realisation of the process of ice road foundations moistening on dried swamps. On the first mobile facility there is a power plant with a fuel reservoir and a pump for water intake from pre-drilled wells equipped with heat insulated casing pipes with a thread. The pump is connected with an accumulator-heater by means of a hose, the drum for which is arranged on the second mobile facility. The hose is connected with combs - distributors for distribution of water installed on the third mobile facility.
EFFECT: efficiency of foundation preparation for ice roads.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO SPEED UP FREEZING OF BASES FOR ICE ROADS | 2010 |
|
RU2439238C1 |
PNEUMATIC ROLLER TO FLATTEN GROUNDWORK BASE | 2009 |
|
RU2398063C1 |
ROLLER FOR FLATTENING ROAD BASES | 2008 |
|
RU2387753C1 |
AGGREGATE FOR SINKING WITH REINFORCEMENT OF BASIS FOR WINTER SNOW ROAD ON BOGS | 2008 |
|
RU2372441C1 |
METHOD TO CONTROL HEAT INSULATION OF SWAMP BEDS OF ICE ROADS BEFORE FLATTENING | 2012 |
|
RU2488657C1 |
VIBRATION PACKER | 2010 |
|
RU2439240C1 |
COMBINED AGGREGATE FOR PREPARATION OF FOUNDATIONS FOR ICE ROADS ON SWAMPS | 2008 |
|
RU2373322C1 |
ROLL WITH MOVABLE LUGS TO PREPARE BEDS FOR WINTER ROADS ON MARSHES | 2007 |
|
RU2349701C1 |
VIBRATION ROLL TO PREPARE WINTER ROAD BEDS ON MARSHES | 2007 |
|
RU2349702C1 |
METHOD FOR CREATING ADDITIONAL RESERVES OF WATER AT RESTORATION OF PEAT BOGS | 2017 |
|
RU2640829C1 |
Authors
Dates
2013-07-10—Published
2012-01-10—Filed