FIELD: transport.
SUBSTANCE: vibration packer consists of two stages pivoted together to allows free turn of first stage relative to second stage. Subgrading-leveling stage mounted at front by means of hinges and hydraulic cylinders. Second stage frame supports work drum with grousers mounted staggered along circumference by means of hinges and hydraulic cylinders that features spherical work surfaces at apices. Steel plate rests via steel rolls freely rolling driven by moments originating in drum turns on drum inner surface. Said steel plate is furnished with vibrator and suspended on to drum axle by means of suspensions and roller bearings with damping rings. Drum axle is mounted on second stage frame by means of hinge links and two hydraulic cylinders. Frames of the first and second stages are mounted on rubber-tires wheels. Heat generator is arranged on second stage frame connected via fuel line and fuel pump with fuel tank and, via branch pipes, turbo compressor, pipeline, and roller jacket inner space, with grousers.
EFFECT: efficient warm-up of frozen marsh surface.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
AGGREGATE FOR SINKING WITH REINFORCEMENT OF BASIS FOR WINTER SNOW ROAD ON BOGS | 2008 |
|
RU2372441C1 |
ROLLER FOR FLATTENING ROAD BASES | 2008 |
|
RU2387753C1 |
COMBINED AGGREGATE FOR PREPARATION OF FOUNDATIONS FOR ICE ROADS ON SWAMPS | 2008 |
|
RU2373322C1 |
ROLL WITH MOVABLE LUGS TO PREPARE BEDS FOR WINTER ROADS ON MARSHES | 2007 |
|
RU2349701C1 |
VIBRATION ROLL TO PREPARE WINTER ROAD BEDS ON MARSHES | 2007 |
|
RU2349702C1 |
DEVICE FOR PREPARATION OF FOUNDATIONS OF ICE ROADS ON DRIED SWAMPS | 2012 |
|
RU2487210C1 |
PNEUMATIC ROLLER TO FLATTEN GROUNDWORK BASE | 2009 |
|
RU2398063C1 |
METHOD TO SPEED UP FREEZING OF BASES FOR ICE ROADS | 2010 |
|
RU2439238C1 |
ROLLER FOR PREPARATION OF BASE FOR TEMPORARY WINTER ROADS AT SWAMP AREAS | 2007 |
|
RU2341608C1 |
DEVICE FOR REPAIRING WINTER SNOW ROAD | 2013 |
|
RU2530966C1 |
Authors
Dates
2012-01-10—Published
2010-06-30—Filed