FIELD: oil and gas industry.
SUBSTANCE: method includes delivery of a shank with a set of packers and unions, downhole geophysical multi-purpose device to the hole end at a logging cable. Pumping into the well of a fluid containing thermal- and neutron-contrasting agents and periodical measurements. Contrasting fluid is pumped by several portions with volumes not less than interior volume of the horizontal borehole by means of subsequent switching into operation of different boreholes intervals covered by packers, by means of opening and closure control of outlet connections. Oil is used as a contrasting fluid instead of water. Movement of the contrasting fluid through the borehole is monitored by gamma-ray modules, resistivity meter or thermoconductive flowmeter.
EFFECT: improving accuracy for determination of operating intervals and sources of flooding under conditions of horizontal wells operation.
5 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL SURVEYING METHOD | 2012 |
|
RU2485310C1 |
METHOD FOR MONITORING PRODUCING HORIZONTAL BOREHOLES | 2021 |
|
RU2781311C1 |
METHOD OF QUANTITATIVE EVALUATION OF INFLOW PROFILE IN HORIZONTAL OIL WELLS WITH MULTISTAGE HFF | 2018 |
|
RU2701272C1 |
METHOD FOR DETERMINING FLOW PROFILE IN LOW-RATE HORIZONTAL WELLS WITH MULTI-STAGE HYDRAULIC FRACTURING | 2018 |
|
RU2680566C1 |
SURVEYING METHOD OF HORIZONTAL WELL | 2010 |
|
RU2406822C1 |
METHOD FOR DETERMINING BEHIND-CASING FLOWS | 2013 |
|
RU2510457C1 |
METHOD FOR SELECTIVE BOTTOMHOLE ZONE PROCESSING OF INHOMOGENEOUS STRATIFIED PRODUCTIVE FORMATION | 2014 |
|
RU2600800C2 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
RECOVERING METHOD OF WORKING CONDITION OF GAS-OIL PRODUCTION WELL WITH HORIZONTAL AND/OR SUBHORIZONTAL END DURING OPERATION, AND TECHNOLOGICAL COMPLEX FOR METHOD'S IMPLEMENTATION | 2011 |
|
RU2482268C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
Authors
Dates
2013-08-20—Published
2011-10-06—Filed