FIELD: oil and gas industry.
SUBSTANCE: according to the method a pool zone is selected with hydrodynamically related wells. Product is withdrawn from producers with production rate analysis. Displacement agent is injected to injectors, at that contour lines of wells mutual influence are defined and production rates of producers are corrected. Analysis of production rate for producers and displacement agent injection to injectors is based on detected interconnections of injectors with the respective producers against their total production rate. Real operation data is considered for the selected zones using historic data within the period from 1 up to 20 years with increment size of 1-3 months and current data for the time of optimization operations performance. By production rate control in the producers the volume of injection to the injectors is changed and redistributed considering impact of the respective producers and injectors. Total volume of injection is changed not more than per 10%. Cycles of withdrawal and pressure recovery at producers are regulated including time of cyclic forced product withdrawal during 2-3 months from producers with maintained or slightly increased water cut with further pressure recovery for these wells. At that remaining reserves are depleted using current stock of wells with increase in total production rate and decrease in total water production. Flows of fluid motion are redistributed till remaining oil reserves are depleted.
EFFECT: increasing oil recovery factor due to optimized operation modes for injectors and product withdrawal from producers.
4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
CONTROL METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2528185C1 |
CONTROL METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2521245C1 |
METHOD OF REGULATING DEVELOPMENT OF OIL FIELD | 2017 |
|
RU2672921C1 |
METHOD OF REGULATING THE DEVELOPMENT OF OIL FIELDS | 2022 |
|
RU2794832C1 |
METHOD FOR INCREASING THE EFFICIENCY OF HYDRODYNAMIC METHODS FOR INCREASING THE PETROLEUM RECOVERY OF A RESERVOIR | 2020 |
|
RU2759143C1 |
PROCESS OF OIL FIELD DEVELOPMENT CONTROL | 2006 |
|
RU2328592C2 |
METHOD OF OPERATIVE CONTROL OF WATER FLOODING OF FORMATIONS | 2019 |
|
RU2715593C1 |
METHOD FOR REGULATING DEVELOPMENT OF OIL DEPOSIT | 2021 |
|
RU2753215C1 |
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS | 2024 |
|
RU2820950C1 |
METHOD OF REAL-TIME CONTROL OF RESERVOIR FLOODING | 2015 |
|
RU2614338C1 |
Authors
Dates
2015-07-27—Published
2014-07-04—Filed