FIELD: information technology.
SUBSTANCE: system includes first functionality that generates output representing an operational status of the controlled equipment, as well as second functionality that generates output representing an operational status of one or more of the control devices. The first functionality is matched with the second functionality to generate an operational status of the control environment. The virtual reality environment is responsive to user interaction with one or more input devices to generate a 3D display so as to allow the user to interact with either the control devices or the controlled equipment represented by the 3D display of the control environment. A subsystem accesses features of said interactions either from the first or the second functionality to discern resulting changes in the operational status of the control environment. It applies features of those changes to the virtual reality environment to effect corresponding variation in the 3D display of the control environment, i.e. variation indicative of the resulting change in the control environment.
EFFECT: improved digital data processing systems and methods.
30 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
SIMULATOR FOR TRAINING COMPLEX TASKS OF STUDY OF ASTRONOMICAL OBJECT BY PARTICIPANTS OF SPACE EXPEDITION | 2015 |
|
RU2581643C1 |
REMOTE CONTROL DEVICE FOR CRANE, CONSTRUCTION MACHINE AND/OR LIFT TRUCK | 2017 |
|
RU2741456C2 |
METHOD OF TESTING MOBILE MILITARY ROBOTIC COMPLEXES AND STAND FOR ITS IMPLEMENTATION | 2016 |
|
RU2630860C1 |
AUTOMATED STAND FOR PERSONNEL TRAINING IN OIL FIELD EQUIPMENT OPERATION | 2015 |
|
RU2611275C2 |
SYSTEM AND METHOD PROVIDING ARC WELDING TRAINING IN REAL-TIME SIMULATED VIRTUAL REALITY ENVIRONMENT USING REAL-TIME WELD PUDDLE FEEDBACK | 2009 |
|
RU2491649C2 |
INSTRUCTION TECHNOLOGY COMPLEX FOR TRAINING OF ALL-ARMS UNITS AT COMBAT TRAINING CENTRE | 2016 |
|
RU2610725C9 |
TEST BENCH FOR FULL-SCALE TESTS OF COMPLICATED SHIP WEAPONS HARDWARE COMPLEX (SWHC) AND METHOD FOR ANALYSIS, DEVELOPMENT AND PREPARATION OF FULL-SCALE TESTS OF COMPLICATED SHIP WEAPONS HARDWARE COMPLEX | 2012 |
|
RU2520816C1 |
EXPERIMENTAL-DEBUGGING SYSTEM FOR SHIP INTEGRATED NAVIGATION SYSTEMS | 2018 |
|
RU2696964C1 |
REMOTE CONTROL DEVICE FOR CRANE, CONSTRUCTION MACHINE AND/OR LIFT TRUCK | 2017 |
|
RU2719048C1 |
SIMULATING DEVICE FOR CRANE, CONSTRUCTION MACHINE OR FLOOR-TYPE TRANSPORT MEANS | 2017 |
|
RU2730796C2 |
Authors
Dates
2013-10-10—Published
2009-06-19—Filed