FIELD: mining.
SUBSTANCE: method of mine insulation involves preliminary determination of rock deformation depth around the mine to be insulated. Further, a system of blast holes not deeper than rock deformation zone is created in insulation area before bridge erection. Blast holes are positioned in fan pattern, with at least three rings formed across the mine to be insulated. Work agent is loaded to blast holes till intake is exhausted. Then, airtight bridges are installed in blast hole intervals between outermost rings, and gas medium is pumped to space between bridges to maintain gas pressure in space between bridges not lower than pressure in the insulated mine during the whole mine insulation period.
EFFECT: enhanced reliability of mine insulation by sealing surrounding rock fractures regardless of fracture position and formation time.
3 cl, 1 ex, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESSING METHOD OF INSULATION OF MINE WORKING AT THERMAL DEVELOPMENT OF OIL DEPOSITS | 2017 |
|
RU2687725C1 |
THERMAL WELL METHOD OF DEVELOPING FRACTURED DEPOSIT OF EXTRA-HEAVY OIL | 2011 |
|
RU2467161C1 |
METHOD OF CONSTRUCTION AND REPAIR OF VENTILATION FACILITIES IN COAL AND SHALE MINES | 2016 |
|
RU2663984C2 |
METHOD FOR REDUCING GAS EMISSION AND GAS PERMEABILITY IN COAL MINE | 2017 |
|
RU2681047C2 |
METHOD FOR DEVELOPMENT OF DEPOSITS OF HIGH-VISCOSITY OIL OR NATURAL BITUMEN | 2015 |
|
RU2608104C1 |
COMBINED METHOD OF THERMAL WELL DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT | 2010 |
|
RU2425211C1 |
THERMAL SHAFT METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2012 |
|
RU2522112C1 |
METHOD OF TUNNELLING IN ROCKS | 2011 |
|
RU2485319C1 |
METHOD OF HOT WELL DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT BY SINGLE-BED SYSTEM | 2013 |
|
RU2529039C1 |
METHOD OF OPERATION OF PRODUCING GALLERIES OF DIP-WORKING BLOCKS AT THERMAL DEVELOPMENT OF OIL FIELDS | 2015 |
|
RU2624838C1 |
Authors
Dates
2013-10-20—Published
2012-04-05—Filed