FIELD: mining.
SUBSTANCE: method of tunnelling is characterised by the fact that rocks are broken at a bottomhole with a fluid working agent under pressure, at the same time mines and wells are arranged along the perimetre and along the frontal area of the bottomhole; the distance between these mines is chosen with account of breaking action at rocks with a reheated gas or steam-gas working agent under pressure, which is generated with a multi-module jet plant and its working devices, and also extended elastic tubular elements are used, filled with an energy composition that generates a reheated agent under high pressure, with the help of which the specified mines and wells are arranged in the rock massif; the massif is damaged and ground. The bottomhole is cleaned by pressure at the bottomhole end to damaged parts of the rock massif with a working medium in the form of reheated steam-gas phases under pressure.
EFFECT: efficient complex action at a bottomhole with higher efficiency, lower labour and power inputs.
6 cl
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF DRIVING COURSES IN SEDIMENTARY ROCK | 2007 |
|
RU2344264C2 |
METHOD FOR FORMING WELLS AND EXCAVATIONS IN SEDIMENTARY ROCK LAYERS AND FROZEN SOIL | 2002 |
|
RU2225931C1 |
METHOD OF TRENCHLESS PIPELINE CONSTRUCTION | 2006 |
|
RU2326284C1 |
TECHNOLOGY FOR DEVELOPMENT OF WELLS AND BORES | 2008 |
|
RU2373366C1 |
METHOD FOR DEVELOPMENT OF WELLS AND WORKINGS IN ROCKS | 2011 |
|
RU2457311C1 |
GEAR TO DRIVE WORKINGS IN GEOLOGICAL STRUCTURES | 2002 |
|
RU2222681C1 |
METHOD OF MAKING HOLES AND WORKINGS IN GEOLOGICAL STRUCTURES | 1999 |
|
RU2168598C1 |
METHOD OF MAKING HOLES AND WORKINGS IN GEOLOGICAL STRUCTURES | 1999 |
|
RU2169248C2 |
WORKING MEMBER OF SELF-CONTAINED DRILLING APPARATUS | 2000 |
|
RU2178505C1 |
METHOD FOR DEVELOPMENT OF MINERAL FIELD | 2011 |
|
RU2455449C1 |
Authors
Dates
2013-06-20—Published
2011-12-15—Filed