FIELD: mining.
SUBSTANCE: opencast mine includes sites and a trench on an end board with a crushing-overloading point arranged on the sites, as well as a belt conveyor lift in the trench, serving to crush rock mineral, unloaded from dump trucks, and its transportation to the surface with further transportation by a conveyor line to a crushing-dressing plant. The opencast mine includes an external trench, in which there is a crushing-overloading point, equipped with mobile crushing-overloading plants, and a part of a conveyor line to the crushing-dressing factory, and also a horizontal transport terrace, connecting the bottom of the outer trench with the terrace of the capital exit of the opencast mine.
EFFECT: reduced costs for development of an opencast mine due to generation of the entire volume of mineral from an opencast mine to a crushing-dressing plant with motor-conveyor transport.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPEN DEVELOPMENT OF MINERAL DEPOSITS | 2015 |
|
RU2579086C1 |
QUARRY | 2016 |
|
RU2632612C1 |
METHOD FOR UPDATING A QUARRY | 2005 |
|
RU2291302C2 |
METHOD FOR OPEN PIT MINING OF MINERAL DEPOSITS | 2016 |
|
RU2645051C2 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD FOR OPEN DEVELOPMENT OF DEEP-LYING STEEPLY FALLING MINERAL DEPOSITS | 2018 |
|
RU2693798C1 |
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
PIT BORDER | 2007 |
|
RU2353769C2 |
PROCEDURE FOR OPEN PIT DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2394158C1 |
METHOD OF OPEN PIT COMPLETION | 2007 |
|
RU2352781C1 |
Authors
Dates
2013-11-10—Published
2012-03-22—Filed