FIELD: mining.
SUBSTANCE: quarry includes a rib with capital automobile entry, located between the routes of steeply-inclined conveyor lifts, located along the borders of this rib with quarry ribs opposite to each other. The lifts come to the surface on opposite sides of the quarry and serve for delivery of ore to crushing and recovery plan and overburden rock to the overburden rock stockpiles. The rib with the capital entry also includes pads for crushing and reloading locations, serving for the crushing mudded ore and overburden rocks, and the tail sections of the steeply-inclined conveyor lifts. At the same time, the capital entry serves for dump trucks entry from working area of the quarry to unloading pads of both crushing and reloading locations.
EFFECT: reduction of the volume of excavation of overburden for car arrivals from the working area of the quarry to the unloading sites of crushing and reloading points.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPEN DEVELOPMENT OF MINERAL DEPOSITS | 2015 |
|
RU2579086C1 |
OPENCAST MINE | 2012 |
|
RU2498068C1 |
METHOD FOR OPEN PIT MINING OF MINERAL DEPOSITS | 2016 |
|
RU2645051C2 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD FOR OPEN DEVELOPMENT OF DEEP-LYING STEEPLY FALLING MINERAL DEPOSITS | 2018 |
|
RU2693798C1 |
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
METHOD FOR DEVELOPMENT OF DEEP HORIZONS OF DIAMOND-MINING PITS IN CRYOLITHOZONE CONDITIONS | 2019 |
|
RU2698750C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
METHOD OF OPEN MINING OF MINERAL DEPOSITS WITH FORMING OF DUMP WITH LARGE VOLUME AND HEIGHT IN DIFFICULT CONDITIONS | 2011 |
|
RU2543765C2 |
Authors
Dates
2017-10-06—Published
2016-03-31—Filed