FIELD: mining.
SUBSTANCE: method consists in plugging with quick-hardening resins, for instance, polyurethane, of a contour layer of the rock via blast holes with depth of 0.4-0.5 m. Injection of resin into the blast hole is stopped after its extrusion to the surface of the rock at the distance of 0.7-0.8 of the distance between adjacent blast holes within the rock support stage. Drilling of additional blast holes of design depth for plugging of the rock massif with mobile hardening mixes.
EFFECT: reduced cost of strengthening of rock massif around a mine due to reduced volume of plugging of expensive quick-hardening resins, possibility to withdraw and repeatedly use blast holes drilling heads, simplified injection equipment.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRIVING DRAINING MINES IN BROKEN AND WATERED MASSIF | 2002 |
|
RU2249699C2 |
“BRIDGE-CEMENT CURTAIN” CONSOLIDATING ISOLATION SYSTEM CONSTRUCTION METHOD | 2018 |
|
RU2679212C1 |
METHOD FOR STRENGTHENING FACKED ROCKS DURING CONSTRUCTION OF CONNECTIONS OF HORIZONTAL MINING WORKS | 2021 |
|
RU2760451C1 |
TAMPING METHOD OF MARGINAL ROCKS MASSIF OF MINES BRIDGES | 2018 |
|
RU2677722C1 |
METHOD OF CONSTRUCTING A VERTICAL SHAFT | 0 |
|
SU877031A1 |
ERECTION METHOD OF NON-CUTTING CONNECTION STRAP IN DRIFT WAY MADE IN MOUNTAIN SLOPE | 2012 |
|
RU2503817C1 |
METHOD OF SUPPORTING WORKINGS | 0 |
|
SU1745953A1 |
TUNNEL CONSTRUCTION METHOD | 0 |
|
SU1550157A1 |
METHOD OF SECURING STABILITY OF MINE WORKING | 0 |
|
SU1573188A1 |
METHOD OF ERECTING A ROOF SUPPORT IN MINE WORKING | 0 |
|
SU985304A1 |
Authors
Dates
2013-11-10—Published
2012-06-07—Filed