FIELD: mining.
SUBSTANCE: drill pipe includes a polymer basic structure formed of bismaleimide polymer reinforced with fibres; and a hydrophobic coating including a maleimide complex and chemically connected to polymer basic structure. The coating forms a covalent link with polymer basic structure. A drill pipe erection method involves erection of the basic structure of the drill pipe from polymer material; production of hydrophobic coating; and creation of covalent chemical link between the coating and the basic structure. The coating for application onto the drill pipe is made of many layers, at least one of which is made from the material containing a chemical reagent chosen for a reaction in presence of borehole fluid media that have destructive nature in relation to polymer material.
EFFECT: providing formation of a coating on the drill pipe, which is adequately connected to the below-lying basic structure of the polymer material so that it can withstand corrosive medium present in the borehole application.
30 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL FIELD POLYMER PIPE REINFORCED WITH FIBRES AND METHOD OF ITS PRODUCTION | 2010 |
|
RU2564335C2 |
SYSTEM FOR WELL INTERVENTION AND METHOD OF OPERATING THE SYSTEM FOR WELL INTERVENTION | 2019 |
|
RU2805143C2 |
PRE-IMPREGNATED CONDUCTIVE COMPOSITE SHEET AND METHOD OF ITS PRODUCTION | 2017 |
|
RU2733611C2 |
PROCEDURE AND SYSTEM FOR DECREASING LOCAL STRESSES IN TUBULAR ELEMENTS (VERSIONS) | 2007 |
|
RU2395032C2 |
COMPOSITE MATERIALS | 2013 |
|
RU2631299C2 |
DELAYED FRACTURE OF STRUCTURE OF FLUID MEDIA FOR WELL TREATMENT | 2009 |
|
RU2509879C2 |
CONFORMAL COMPOSITE ANTENNA ASSEMBLY | 2016 |
|
RU2714862C2 |
MALAIMIDE RESINS | 2012 |
|
RU2643806C2 |
LENGTHWISE REINFORCED HARDENED ON-SITE LINING AND REINFORCED COATING | 2006 |
|
RU2419021C2 |
TILING MATERIAL HARDENED IN-SITU WITH LONGITUDINAL REINFORCEMENT | 2004 |
|
RU2362678C2 |
Authors
Dates
2013-12-20—Published
2010-04-23—Filed