FIELD: oil-and-gas industry.
SUBSTANCE: injection wells and horizontal extracting wells are drilled, heat carrier is injected via injection wells and oil is extracted through production wells. Horizontal well is drilled above the water-oil surface (WOS) while vertical well is drilled at least 50 m from horizontal well bottom. Pool is exposed another time in vertical well above and below horizontal well. Pipe string is downed in injection well to set packer in place between openings. Displacement agent is injected via top opening and pipe space while bottom opening - via pipe string.
EFFECT: higher efficiency of oil displacement, increased oil extraction, higher extraction rate.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING OIL POOL USING HORIZONTAL MULTIBRANCH WELLS | 2012 |
|
RU2505668C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT WITH CARBONATE COLLECTOR | 2012 |
|
RU2520123C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT AT LATE STAGE | 2012 |
|
RU2506418C1 |
METHOD OF OIL POOL DEVELOPMENT USING BRANCHED HORIZONTAL WELLS | 2012 |
|
RU2504649C1 |
DEVELOPMENT METHOD OF WATER-OIL RESERVOIR | 2020 |
|
RU2732742C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT COMPLICATED BY VERTICAL INTERRUPTIONS | 2015 |
|
RU2595105C1 |
DEVELOPMENT METHOD OF OIL DEPOSITS WITH HORIZONTAL WELLS | 2012 |
|
RU2488690C1 |
METHOD OF DEVELOPMENT OF BITUMINOUS OIL DEPOSIT BY THERMAL ACTION ON FORMATION | 2018 |
|
RU2687833C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2090742C1 |
METHOD FOR DEVELOPMENT OF FORMATION WITH BOTTOM WATER | 2020 |
|
RU2738146C1 |
Authors
Dates
2014-01-20—Published
2012-07-27—Filed