FIELD: machine building.
SUBSTANCE: valve 100 comprises: body 101, first fluid channel 111, second fluid channel 112, first valve element 130 to translate in first direction X112 between open and closed positions of one or every first channel 111. Body 101 makes first seat 123 for first valve element 130 and second valve element 130 to translate in second direction X112 between open and closed positions of one or every second channel 112. First and second directions X112 are parallel or aligned. First valve element 130 makes recess 140 for second valve element 130. First valve element 130 makes recess 136 for second valve element 130. Body 101, 201, 301 comprises bore 14.1, 204.1 shared by first and second channels 111; 211; 311 and 112; 212; 312. First needle 130, 230, 330 and second needle 160, 260, 360 pass level with said bore 104.1.
EFFECT: perfected design.
Title | Year | Author | Number |
---|---|---|---|
COATING MATERIAL SPRAYER AND METHOD OF SPRAYER REFILLING WITH COATING MATERIAL | 2009 |
|
RU2500485C2 |
BOILER WITH CHECK VALVE, BUILT INTO WATER PIPELINE | 2015 |
|
RU2676172C2 |
VALVE ASSEMBLY AND VALVE STOCK ASSEMBLY | 2008 |
|
RU2465507C2 |
VALVE | 2014 |
|
RU2653618C2 |
VALVE | 2010 |
|
RU2529467C2 |
VALVE-TYPE COVER FOR SPRAYER-GUN CAN | 2003 |
|
RU2361682C2 |
DEVICE FOR MACHINE OF DISPLACEMENT TYPE, CONTROLLING GEAR ARRANGEMENT FOR DEVICE AND USE OF CONTROLLING GEAR ARRANGEMENT | 2014 |
|
RU2651000C2 |
LEVER OF A VALVE DRIVE | 2018 |
|
RU2763354C2 |
TRAVERSE FOR ROTARY VALVE | 2017 |
|
RU2754379C2 |
DEVICE FOR SHIFTING TYPE MACHINE, CONTROL GEAR DRIVE FOR DEVICE AND USE OF CONTROL GEAR DRIVE | 2014 |
|
RU2730811C2 |
Authors
Dates
2014-02-27—Published
2009-12-08—Filed