FIELD: information technology.
SUBSTANCE: method involves, in response to one of a first plurality of processing resources in a first scheduling node becoming available, searching for a first task to execute in a first scheduling collection corresponding to the first scheduling node; in response to finding no first task to execute in the first schedule collection, executing, with the one of the first plurality of processing resources, a second task from a second scheduling collection corresponding to a second scheduling node that includes a second plurality of processing resources. The first and second scheduling nodes are detected for the scheduler based on one or more execution indicators for corresponding sets of computer system components. The first and second collections of the scheduled tasks are transformed into a queue of at least partial search by comparing execution costs between at least the first and second scheduling nodes.
EFFECT: high efficiency of allocating computer system resources.
13 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
SCHEDULER INSTANCES IN PROCESS | 2009 |
|
RU2530345C2 |
VIRTUAL NON-UNIFORM MEMORY ACCESS ARCHITECTURE FOR VIRTUAL MACHINES | 2010 |
|
RU2571366C2 |
RECOVERY OF CONTROL OF PROCESSING RESOURCE, WHICH PERFORMS EXTERNAL CONTEXT OF EXECUTION | 2009 |
|
RU2494446C2 |
REQUEST PROCESSING METHOD AND SYSTEM (VERSIONS) | 2010 |
|
RU2534953C2 |
JOB SCHEDULING AND MONITORING | 2015 |
|
RU2707389C2 |
SYSTEM AND METHOD OF SCHEDULING ACTIVE TASKS IN OPERATING SYSTEM | 2009 |
|
RU2420792C1 |
VIRTUAL NON-UNIFORM MEMORY ARCHITECTURE FOR VIRTUAL MACHINES | 2010 |
|
RU2569805C2 |
SCHEDULING DYNAMIC BROADCAST CHANNEL | 2008 |
|
RU2441343C2 |
THE METHODS AND DEVICES FOR PERFORMANCE OF THE OPERATIONS ON THE TREE OF CHANNEL | 2008 |
|
RU2442210C2 |
VIRTUAL SCHEDULING IN HETEROGENEOUS NETWORKS | 2009 |
|
RU2472288C2 |
Authors
Dates
2014-03-27—Published
2009-03-27—Filed