FIELD: oil and gas industry.
SUBSTANCE: invention relates to mining, more precisely to open mining of high deposits with use of continuous operation technique. The method includes cutting of a permanent trench, construction of a working trench, installation of transportation lines, bench cutting of mineral resources by continuous extraction and haulage system with a fan-shaped area of operations. When operations are performed in the fan-shaped manner a solid bed located outside the fan-shaped border is developed simultaneously; mineral deposits are shipped to transportation lines and at first the area of a V-shaped cut is determined at the fan-shaped area of operations in compliance with the following condition:
EFFECT: reducing labour intensity, increasing efficiency, sound extraction of mineral resources and safety of mining operations.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
OPEN DEVELOPMENT METHOD OF MINERAL DEPOSITS | 2013 |
|
RU2541352C1 |
EXCAVATION METHOD OF USEFUL DEPOSIT AT FAN-LIKE ADVANCE OF SCOPE OF MINING OPERATIONS | 2013 |
|
RU2536909C1 |
PROCEDURE FOR OPEN PIT DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2394157C1 |
METHOD FOR OPEN MINING OF MINERAL DEPOSITS | 2012 |
|
RU2485315C1 |
METHOD OF MINING OPERATIONS IN FAN-MINING METHOD | 2013 |
|
RU2532298C1 |
METHOD OF DEPOSITION OPEN WORKING | 2013 |
|
RU2520619C1 |
DEVELOPMENT METHOD OF MINERAL RESOURCES BY SPIRAL PIT | 2010 |
|
RU2435032C1 |
METHOD OF RESTRUCTURING AN OPEN MINE | 0 |
|
SU1176076A1 |
METHOD FOR OPENCAST MINING OF MINERALS | 0 |
|
SU1675557A1 |
METHOD FOR KIMBERLITE PIPE | 2018 |
|
RU2691032C1 |
Authors
Dates
2014-04-20—Published
2012-10-02—Filed