FIELD: construction.
SUBSTANCE: method for winter concreting of building structures includes preparation of a concrete mix and laying of the mix into a formwork as a concreted layer, at the same time blind boreholes are created in the concreted layer, porous inserts are installed into the specified boreholes with provision of capillary removal of released excessive hardening water via the installed inserts, besides, ratios between the depth Hb of boreholes, diameter Db of boreholes, thickness H"п" of the concreted layer and the distance between adjacent boreholes Lb is set in compliance with the following conditions: Hb/H"п"=0.40-0.60, Lb/Hb=0.90-1.10, Db/Hb=0.10-0.20.
EFFECT: improved operating characteristics.
3 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WINTER CONCRETING - "DRY HOT THERMOS" | 2000 |
|
RU2164867C1 |
METHOD TO ERECT MONOLITHIC REINFORCED CONCRETE STRUCTURES IN WINTER CONDITIONS | 2012 |
|
RU2487981C1 |
METHOD OF WARMING OF MONOLITHIC CONSTRUCTIONS BEFORE RESUMPTION OF CONCRETE PLACEMENT | 1996 |
|
RU2100543C1 |
METHOD AND DEVICE FOR LAYING AND COMPACTING FIBROUS-CONCRETE MIXTURE IN FORMWORK | 0 |
|
SU1838550A3 |
METHOD OF PREPACKED CONCRETING | 2017 |
|
RU2658737C1 |
RAW MATERIALS MIXTURE AND METHOD FOR PRODUCTION OF BUILDING ARTICLES AND CONSTRUCTIONS | 1993 |
|
RU2071456C1 |
BRIDGE ROADWAY FLOORING AND METHOD OF ITS CONSTRUCTION | 0 |
|
SU804755A1 |
METHOD OF CONCRETING SOLID STRUCTURES | 0 |
|
SU1449348A1 |
METHOD OF PREPARATION FOR QUALITY CONTROL OF CAST-IN-PLACE CONCRETE IN PRECAST SOLID WALLS WITH ELEMENTS OF FIXED REINFORCED CONCRETE FORMWORK | 2016 |
|
RU2653211C2 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY OF CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107783C1 |
Authors
Dates
2014-04-20—Published
2012-12-14—Filed