FIELD: arrangement of monolithic extended concrete and reinforced-concrete constructions in winter conditions. SUBSTANCE: method consists in placing of a layer of hot expanded clay aggregate at a temperature of 200 to 300 C in an installed warmth-kept formwork directly on a frozen base, it is distributed and packed in the formwork. Then, after the hot expanded clay aggregated gets cooled down to a temperature below 100 C, it is injected by cement-sand mortar. After that a temporary warmth-keeping of the concreted construction is accomplished. EFFECT: prevented power expenditures due to reuse of the heat of the cooling down expanded clay aggregate, solved ecological problem of salvaging of heat of the cooling down expanded clay aggregate. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PAVEMENT REPAIR | 2000 |
|
RU2171237C1 |
METHOD OF PREPACKED CONCRETING | 2017 |
|
RU2658737C1 |
METHOD OF PRODUCTION OF THREE-LAYER GUARDING CLAYDITE-CONCRETE PANEL | 2002 |
|
RU2215649C1 |
METHOD FOR WINTER CONCRETING OF BUILDING STRUCTURES | 2012 |
|
RU2513810C1 |
METHOD FOR PREPARING CLAYDITE-CONCRETE MIXTURE | 2001 |
|
RU2206542C2 |
METHOD OF CONCRETING MASSIVE MONOLITHIC STRUCTURES | 0 |
|
SU1423547A1 |
METHOD FOR ERECTION OF MONOLITHIC BUILDINGS IN WINTER TIME | 2007 |
|
RU2364690C2 |
METHOD OF CONSTRUCTION OF BUILDINGS | 2023 |
|
RU2812973C1 |
METHOD FOR HIGH-SPEED ERECTION OF MONOLITHIC STRUCTURES OF A BUILDING IN CONDITIONS OF LOW TEMPERATURES | 2019 |
|
RU2702486C1 |
METHOD OF PLACEMENT OF CONCRETE OF BULKY MONOLITHIC STRUCTURES | 0 |
|
SU674338A1 |
Authors
Dates
2001-04-10—Published
2000-02-10—Filed