FIELD: oil-and-gas industry.
SUBSTANCE: in compliance with proposed method, at least two pairs of horizontal injection and production wells with their horizontal sections located in parallel one above the other. Heat carrier is injected via upper horizontal injection wells and, simultaneously, high-viscosity oil is extracted through lower horizontal production wells. High-viscosity oil is sampled one to two times a month at every pair of horizontal wells space apart by 100 to 150 meters. Oil samples are dewatered to analyse oil viscosity. Then, pairs of horizontal wells are selected with oil viscosity differing by 10% and more to analyse the influence of variation in high-viscosity oil of said pairs of well on steam chambers heating uniformity and to control heat carrier injection conditions and product extraction. Yield and viscosity are monitored.
EFFECT: higher efficiency of development.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
HIGHLY VISCOUS OIL FIELDS PRODUCTION METHOD | 2008 |
|
RU2379494C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HIGHLY VISCOUS OIL OR BITUMEN | 2014 |
|
RU2583469C1 |
DEVELOPMENT METHOD FOR HIGH-VISCOSITY OIL OR BITUMEN FIELD | 2014 |
|
RU2550635C1 |
ULTRA VISCOUS OIL HETEROGENEOUS RESERVOIR DEVELOPMENT METHOD | 2018 |
|
RU2678738C1 |
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS | 2022 |
|
RU2795285C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2689102C2 |
DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2014 |
|
RU2555713C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF TWO WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431745C1 |
HIGHLY VISCOUS OIL OR BITUMEN FIELD DEVELOPMENT METHOD | 2016 |
|
RU2610966C1 |
METHOD OF BITUMEN FIELD DEVELOPMENT | 2016 |
|
RU2623407C1 |
Authors
Dates
2014-04-27—Published
2012-12-03—Filed