FIELD: metallurgy.
SUBSTANCE: method of pyrometallurgical extraction of silver from secondary lead-bearing stock comprises stock furnacing in two steps. First, lead-bearing stock is furnaced at 1150-1200°C, the melt being cooled to 400°C at the rate of 1950°C/h to 2050°C/h. Then, the melt is heated from 400°C/h to 500°C/h to 1150-1200°C to remove the yellow lead from silver surface.
EFFECT: higher yield of silver.
1 tbl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SILVER EXTRACTION FROM SCRAP OF SILVER-ZINC BATTERIES CONTAINING LEAD | 2014 |
|
RU2563612C1 |
METHOD OF IDENTIFICATION OF NOBLE METALS IN SULFIDE ORES AND THEIR PROCESSING PRODUCTS | 2008 |
|
RU2365644C1 |
METHOD OF RECOVERING GOLD FROM GOLD ORE CONCENTRATES | 2004 |
|
RU2259410C1 |
METHOD OF REPROCESSING ACCUMULATOR LEAD SCRAP | 1997 |
|
RU2119540C1 |
METHOD OF LEAD ALLOY CONCENTRATION BY NOBLE METALS | 1995 |
|
RU2094504C1 |
METHOD FOR EXTRACTING GOLD FROM CONCENTRATES | 2010 |
|
RU2439176C1 |
METHOD FOR PROCESSING SULFIDE CONCENTRATES CONTAINING LEAD, NON-FERROUS AND NOBLE METALS | 2006 |
|
RU2316606C1 |
SILVERY FOAM PROCESSING METHOD BY VACUUM DISTILLATION | 2018 |
|
RU2698237C1 |
METHOD FOR OBTAINING CONCENTRATE OF PRECIOUS METALS FROM PRODUCTS OF ORE PROCESSING AND SECONDARY RAW MATERIALS | 2017 |
|
RU2673590C1 |
METHOD FOR PROCESSING OF AURUM-CONTAINING HALF-FINISHED PRODUCTS | 1996 |
|
RU2095446C1 |
Authors
Dates
2014-05-10—Published
2013-03-14—Filed