FIELD: oil and gas industry.
SUBSTANCE: invention group is related to the methods of increase of extraction of heavy or viscous crude oil from an underground reservoir and in variants of its fulfilment is especially related to operations of cold extraction from such reservoir. Substance claim: the method involves oil-bearing reservoir rock and has at least one development well and at least one injection well. The method provides for carrying out secondary recovery operations with the use of displacing fluid; at that, density of extracted oil is within ≤30° API, and the method includes the following operations: (a) overinjection of displacing fluid into reservoir rock with Voidage Replacement Ratio (VRR) from 0.95 to 1.11 until Water-Oil Ratio (WOR) of formed fluids is at least 0.25; and (b) underinjection of displacing fluid into reservoir rock with VRR<0.95 until Gas-Oil Ratio (GOR) of formed fluids is at least twice higher of GOR with dissolved gas of initial oil recovered from a well; at that, during water injection, accumulated VRR is kept within 0.6 to 1.25.
EFFECT: invention facilitates upgraded efficiency of the methods.
48 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
ZONE CORRECTION METHOD INSIDE UNDERGROUND HYDROCARBONS-CONTAINING FORMATIONS (VERSIONS) | 2010 |
|
RU2550623C2 |
SYSTEMS AND METHODS OF OIL AND/OR GAS PRODUCTION | 2011 |
|
RU2574645C2 |
METHOD OF DYNAMIC ESTIMATION OF COMPLIANCE WITH SPECIFICATION OF OIL RESERVOIR, AND INCREASING OF PRODUCTION AND OIL RECOVERY USING ASYMMETRIC ANALYSIS OF OPERATION INDICES | 2011 |
|
RU2571542C2 |
METHOD FOR DEVELOPMENT OF TECTONICALLY SCREENED OIL-GAS DEPOSIT | 1996 |
|
RU2103487C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT BASED ON SYSTEM ADDRESS ACTION | 2012 |
|
RU2513787C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2090742C1 |
USE OF ALKALI METAL SILICIDES FOR HIGH TEMPERATURE WETTABILITY IMPROVEMENT IN CARBONATE RESERVOIRS | 2014 |
|
RU2679028C2 |
METHOD FOR EXTRACTING DEEPLY IMMERSED HYDROCARBON FORMATIONS | 2005 |
|
RU2295028C1 |
METHOD FOR MULTIPAY FIELD SURVEY AND DEVELOPMENT | 2005 |
|
RU2315863C2 |
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM RESERVOIR | 2009 |
|
RU2424424C1 |
Authors
Dates
2014-06-10—Published
2009-10-08—Filed