FIELD: oil and gas industry.
SUBSTANCE: method involves a stage of vibroseis formation stimulation using an elastic wave generator. Prior to the stage of vibroseis stimulation, multicycle treatment of formation with an inflating agent is performed, which ensures CO2 bleeding. Each of the cycles includes injection in formation of 10-15% water solution of inflating agent and subsequent displacement of it and produced gas deep into formation with water flow till decrease of design concentration of produced gas in water solution to 10-4-10-2 wt %. After the sate of vibroseis stimulation, formation undergoes mud acid treatment.
EFFECT: improving treatment efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROCESSING OF OIL RESERVOIR | 2017 |
|
RU2649712C1 |
TREATMENT METHOD FOR BOTTOMHOLE AREA OF TERRIGENOUS BED OF GAS WELL UNDER ABNORMAL LOW PRESSURE | 2003 |
|
RU2261323C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF RESERVOIR OF OIL WELL | 2012 |
|
RU2519139C2 |
METHOD FOR DISPLACEMENT OF HIGH-VISCOSITY OIL FROM OIL DEPOSIT IN PERMAFROST ZONE | 2014 |
|
RU2555740C1 |
METHOD OF DEVELOPMENT OF AN OIL POOL | 2002 |
|
RU2231631C1 |
METHOD FOR HYDROCARBON DEPOSIT DEVELOPMENT ALONG WITH FORCE APPLICATION TO GEOLOGIC ENVIRONMENT | 2004 |
|
RU2268996C2 |
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT WITH PHYSICAL EFFECT ONTO GEOLOGICAL MEDIUM | 2007 |
|
RU2349741C2 |
GAS WELL PAYOUT BED KILLING METHOD | 2007 |
|
RU2348799C1 |
EMULSIONS CONTAINING WATER-SOLUBLE AGENTS, RETARDING ACID REACTION, AND METHODS OF THEIR PRODUCTION AND APPLICATION | 2016 |
|
RU2736755C2 |
METHOD FOR PULSE TREATMENT OF FORMATIONS | 1990 |
|
RU2070285C1 |
Authors
Dates
2014-06-10—Published
2013-02-19—Filed