FIELD: oil industry, particularly to produce oil from oil deposit, mainly at the later stage of oil field development.
SUBSTANCE: method involves revealing near-vertical const- and/or post-sedimentation crack formation zones extending from crystalline basement to oil formation reservoir in geological environment spreading under productive formation to crystalline basement depth and more, wherein the near-vertical zones are constituted of inversion ring-shaped structures elongated in plane; choosing wells having draining zones communicated with above near-vertical zones in hydrocarbon deposit or drilling additional wells to above near-vertical zones; applying mechanical stress excitement action to above near-vertical zones within frequency band corresponding to temporary fractural crack formation processes and dynamic reconfiguration of above near-vertical zones with oscillating amplitude bias and acceleration parameters, which exceed threshold values characterizing trigger action effects.
EFFECT: increased oil output by providing purposeful selection of objects and time of mechanical stress application in geological environment, increased efficiency of formation energy and geological conditions usage, increased impact depth along with reduced power inputs.
17 cl, 1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT WITH PHYSICAL EFFECT ONTO GEOLOGICAL MEDIUM | 2007 |
|
RU2349741C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2526922C2 |
METHOD FOR EXTRACTING HYDROCARBON DEPOSITS INCLUDING COMPLEX PHYSICAL BED STIMULATION | 2004 |
|
RU2291954C2 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2005 |
|
RU2291955C1 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
METHOD OF DEVELOPMENT OF AN OIL POOL | 2002 |
|
RU2231631C1 |
METHOD FOR HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION | 2012 |
|
RU2584191C2 |
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS | 2007 |
|
RU2357073C2 |
OIL PRODUCTION METHOD WITH FORCE APPLICATION TO RESERVOIR AND DOWNHOLE EQUIPMENT FOR ABOVE METHOD REALIZATION | 2004 |
|
RU2285788C2 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
Authors
Dates
2006-01-27—Published
2004-01-09—Filed