FIELD: mining.
SUBSTANCE: several blast holes are drilled over tunnel contour. Then, several blast holes are drilled by diamond drilling at preset points inside said contour. Blast holes are connected by zones cut by diamond discs at fastening the cutting machine in blast holes. Separate blocks are produced to be destructed by wedge jacks. Lower and upper parts of blocks formed between said zones are cut off by diamond cable in the following order: diamond cable is fitted on rotary tool and rollers to be secured inside predrilled blast holes. Note here that said rotary tool is secured opposite said rollers. Then, said rotary tool is activated to make diamond cable move for cutting of blocks.
EFFECT: lower tunnelling costs, higher efficiency and safety.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO EXPAND TUNNEL | 2012 |
|
RU2513501C1 |
METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS | 2020 |
|
RU2739880C1 |
METHOD OF MAINTAINING WORKINGS WITH HEAVING FLOORS | 0 |
|
SU1717833A1 |
METHOD OF CYCLIC SINKING OF VERTICAL MINE SHAFTS AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2547851C1 |
METHOD OF CONSTRUCTING TUNNEL UNDER TRAFFIC ARTERIES FOR ORGANISING TRAFFIC INTERSECTIONS AT CROSS-ROADS | 2008 |
|
RU2375522C1 |
METHOD OF BARING AND SECURING CHAMBER-TYPE WORKINGS | 0 |
|
SU1049666A1 |
METHOD OF TUNNEL PIERCING UNDER RAILWAY EMBANKMENT | 2006 |
|
RU2339767C2 |
METHOD FOR MINING OF STEEPLY DIPPING ORE BODIES AND METHODS FOR MINING, PROCESSING AND CONCENTRATION OF COPPER, AND/OR COPPER-ZINC, AND/OR ZINC, AND/OR SULFUR ORES WITH POSSIBLE CONTENT OF GOLD, SILVER AND OTHER PRECIOUS AND RARE-EARTH ELEMENTS FROM STEEPLY DIPPING ORE BODIES | 1995 |
|
RU2053364C1 |
METHOD OF PREPARING INUNDATED KIMBERLITE PIPE FOR UNDERGROUND MINING | 1999 |
|
RU2153072C1 |
TUNNEL CONSTRUCTION METHOD | 0 |
|
SU1550157A1 |
Authors
Dates
2014-06-27—Published
2013-03-18—Filed