FIELD: mining. SUBSTANCE: method may be used in preparation for underground mining of inundated kimberlite pipes under conditions of Yakut diamond deposits. Method involves determination of displacement zone round kimberlite pipe caused by underground working of lower horizon, sinking behind displacement zone of main and auxiliary shafts, driving of working over helical line in downward direction round kimberlite pipe, sinking of main and auxiliary shafts for drilling and grouting of holes. Beginning of each turn of spiral working is connected with main shaft, and end of each turn is connected with auxiliary shaft. As working driving advances, grouting holes are drilled. In so doing, center of each next hole is located on intersection of radii r1 and r2, with r1 = k1 F1, r2 = k2 F2, where k1 is coefficient considering nonuniformity of last hole grouting; k1 = 0.6-1.0; F1 is actual diameter of grouting zone of the last grouted hole, m; k2 is coefficient considering nonuniformity of grouting of the last but one hole, k2 = 0.6-1.0; F2 is actual diameter of grouted zone of the last but one hole, m. Working is driven under protection of waterproof curtain formed by grouting of holes drilled from previous turn of workings. Drilled for control over reliability of waterproof curtain are control holes from grouted working of previous turn by leading the driving face to region of location of route of working turn. One part of control holes after opening of working by face is extended to air or to air-passage connections. The method provides for preparation for formation of grouting curtain of high quality with low expenditures and short terms of operation performance. EFFECT: higher efficiency. 3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARING INUNDATED KIMBERLITE PIPE FOR UNDERGROUND MINING IN REGIONS WITH COLD CLIMATE | 1999 |
|
RU2151292C1 |
METHOD AND POWERED COMPLEX FOR MINING KIMBERLITE PIPES | 1996 |
|
RU2116447C1 |
METHOD OF RISE RILL CUT MINING WITH FILLING OF PIPE-LIKE KIMBERLITE DEPOSITS BY POWDER MINING COMPLEX | 1998 |
|
RU2155868C2 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES BY MECHANIZED COMPLEX | 1997 |
|
RU2135772C1 |
METHOD OF MINING OF TUBULAR KIMBERLITE DEPOSITS BY POWERED MINING COMPLEX | 1998 |
|
RU2153073C2 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES IN PERMAFROST ZONE | 1997 |
|
RU2132462C1 |
METHOD OF DOWNWARD WORKING OF KIMBERLITE PIPE BY POWERED MINING COMPLEX AND DESIGN OF FLEXIBLE GUARD ROOFING | 1998 |
|
RU2155867C2 |
METHOD OF MINING KIMBERLITE DEPOSIT EXTENDED ALONG STRIKE BY INCLINED SLICING UNDER FLEXIBLE GUARD ROOFING BY POWERED MINING SET | 1998 |
|
RU2151295C1 |
METHOD OF MINING FLOODED MINERAL DEPOSITS | 0 |
|
SU1190039A1 |
METHOD OF MINE CONSTRUCTION FOR SMALL KIMBERLITE PIPES BY MEANS OF SELF-PROPELLED MINING MACHINERY AND COMPLEX FOR ITS LOWERING AND LIFTING AND ORE DELIVERY TO SURFACE | 1998 |
|
RU2158826C2 |
Authors
Dates
2000-07-20—Published
1999-02-09—Filed